Laserfiche WebLink
14:29 From -KENNEDY A GRAVEN <br />+6123979310 T-295 P.15/20 F-153 <br />Subd. 2. Shared Fees: Registrants who apply for permits for the same Obstruction or excavation, which <br />the Director does not perform, may share in the payment of the Obstruction or Excavation Permit <br />Fee In order to obtain a joint permit, registrants must agree among themselves as to the portion <br />each will pay and indicate the same on their applications <br />Subd. 3. With City Projects: Registrants who join in a scheduled Obstruction or exe4vati0t1 performed <br />by the Director, whether or not it is a joint application by two or more Registrants or a single <br />application, are not required to pay the Excavation or Obstruction and Degradation portions of the <br />permit fee, but a permit would still be received. <br />910.14: SUPPLEMENTARY APPLICATIONS: <br />Subd. I. Limimuon on Area: A Right -of -Way Permit is valid only for the area of the Right -of -Way <br />specified in the permit. No permittee may do any work outside the area specified in the permit, <br />except as provided herein. Any Petmtttee which determines that an area greater than that specified <br />in the permit must be Obstructed or Excavated must before working in that greater area (i) make <br />application for a permit cxtansion and pay any additional fess required thereby, and (h) be granted <br />at new permit or permit extension. <br />Subd. 2. Limitation on dates: A Right -of -Way Permit is valid only for the dates specified in the permit. <br />No Permittee may begin its work before the permit start date or, except as provided herein, <br />continue working after the end date. If a Permittee doss not finish the work by the permit end <br />date, it mgst apply for a new periWt for the additional time it needs, and receive the new permit or <br />an extension of the old permit before working after the end date of the previous permit. This <br />Supplementary Application must be submitted before the permit end date. <br />910.15: OTHER OBLIGATIONS: <br />Subd. 1. Compliance With Other Laws: Obtaining a Right -of -Way Permit does not relieve Permittee of <br />its duty to obtain all other necessary permits, licenses, and authority and to pay all fees required by <br />the City or other applicable rule, law or regulation. A Permittee shall comply with all <br />requirements of local, state and federal laws, including Minn- Stat. - - 216D.01-.09 (One Call <br />Excavation Notice System). A Permittee shall perform all work in conformance with all <br />applicable codes and established rules and regulations, and is responsible for all work done in the <br />Right -of -Way pursuant to its permit, regardless of who does the work. <br />Subd. 2. Prohibited Work: Except in an Emergency, and with the approval of the Director, no Right -of - <br />Way Obstruction or excavation may be clone when seasonally prohibited or when conditions are <br />unreasonable for such work. <br />Subd. 3. interference with Right -of -Way. A Permittee shall nor so Obstruct a Right -of -Way that the <br />natural free and clear passage of water through the gutters or other waterways shall be interfered <br />with. Private vehicles of those doing work in the Right -of -Way may not be parked within or next <br />to a permit area, unless parked in conformance with City parking regulations. The loading or <br />unloading of trucks must be done solely within the defined permit area unless specifically <br />authorized by the permit. <br />S1R-163403 <br />MU210-14 12 <br />