Laserfiche WebLink
The surface layer of the roadway on Long Lake Road between County Road H2 and <br />County Road J in Mounds View will be removed and replaced with new, smooth <br />pavement in 2018. Pedestrian curb updates will also take place and the road will be <br />restriped to add bike lanes. As a result, parking will be removed on the east side of the <br />roadway. <br />There will be no cost to property owners for this project. <br />This project may take up to eight weeks. Driveway access will be maintained throughout <br />the resurfacing. <br />County Road H2 to County Road I <br />Currently, this section of the roadway contains two drive lanes in each direction. The <br />roadway will be restriped to include one travel lane in each direction, a painted median <br />or turn lane and a bike lane on each side of the roadway. <br />County Road I to Eastwood Road <br />The existing roadway has a drive lane in each direction with parking lane on either side. <br />During construction, the road will be restriped to add a bike lane on the west side of the <br />road and remove parking on the west side. Drive lanes will also be maintained. <br />Eastwood Road to 93rd Lane/County Road J <br />The existing roadway includes a drive lane in each direction with a gravel shoulder on <br />each side. Drive lanes will be maintained in each direction. The gravel shoulders will be <br />replaced with new, smooth asphalt. A detached, paved path is being proposed to <br />connect the sidewalk at Long Lake and Eastwood roads with the paved trail along <br />County Road J. <br />Bike Lane Information <br />The striping changes and new bike lanes on the roadway reflect the goals of <br />the Ramsey County's Pedestrian & Bicycle Plan to make the community walkable <br />