My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2018/04/02
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2018
>
Agenda Packets - 2018/04/02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:13 PM
Creation date
6/13/2018 11:21:49 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/2/2018
Supplemental fields
City Council Document Type
City Council Packets
Date
4/2/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The surface layer of the roadway on Long Lake Road between County Road H2 and <br />County Road J in Mounds View will be removed and replaced with new, smooth <br />pavement in 2018. Pedestrian curb updates will also take place and the road will be <br />restriped to add bike lanes. As a result, parking will be removed on the east side of the <br />roadway. <br />There will be no cost to property owners for this project. <br />This project may take up to eight weeks. Driveway access will be maintained throughout <br />the resurfacing. <br />County Road H2 to County Road I <br />Currently, this section of the roadway contains two drive lanes in each direction. The <br />roadway will be restriped to include one travel lane in each direction, a painted median <br />or turn lane and a bike lane on each side of the roadway. <br />County Road I to Eastwood Road <br />The existing roadway has a drive lane in each direction with parking lane on either side. <br />During construction, the road will be restriped to add a bike lane on the west side of the <br />road and remove parking on the west side. Drive lanes will also be maintained. <br />Eastwood Road to 93rd Lane/County Road J <br />The existing roadway includes a drive lane in each direction with a gravel shoulder on <br />each side. Drive lanes will be maintained in each direction. The gravel shoulders will be <br />replaced with new, smooth asphalt. A detached, paved path is being proposed to <br />connect the sidewalk at Long Lake and Eastwood roads with the paved trail along <br />County Road J. <br />Bike Lane Information <br />The striping changes and new bike lanes on the roadway reflect the goals of <br />the Ramsey County's Pedestrian & Bicycle Plan to make the community walkable <br />
The URL can be used to link to this page
Your browser does not support the video tag.