My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2018/05/14
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2018
>
Agenda Packets - 2018/05/14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:00 PM
Creation date
6/13/2018 11:23:19 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
5/14/2018
Supplemental fields
City Council Document Type
City Council Packets
Date
5/14/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
M07M S VIEW <br />of Mounds View Staff R <br />Item No: 8B <br />Meeting Date: May 14, 2018 <br />Type of Business: CB <br />Administrator Review: <br />�7=7i <br />To: Honorable Mayor and City Council <br />From: Don Peterson, Public Works Director <br />Item Title/Subject: Resolution 8952 Accept Bid and Award a Construction <br />Contract to Northwest Asphalt for the Business Park North <br />Street Rehabilitation (Program Ave, Quincy St, Woodale Dr. <br />Clifton Dr.) <br />Background/Discussion: <br />The City is in the process of rehabilitating the Business Park North area. These streets <br />are Northeast of Mounds View Blvd. and West of 35W. These street segments serve <br />twenty seven companies ranging from industrial, light commercial, medical <br />technologies, manufacturing, and several fast food restaurants. There are two nonprofit <br />organizations located in this business park as well. Quincy St. is also a major arterial <br />road from Mounds View Blvd to County Rd. I and a State Aid Road. <br />The City Council has taken the following steps for the rehabilitation of Business Park <br />North: <br />• October 23, 2017, Approve Resolution 8850 Approving the Feasibility Report and <br />set a Public Hearing for November 27, 2017 for Business Park North, Street <br />Rehabilitation (Program Ave, Quincy Street, Woodale Dr, Clifton Dr.). <br />• November 27, 2017 City Council held a Public hearing for Business Park North <br />Pavement Rehabilitation. <br />• February 12, 2018 Authorize Stantec to prepare the plans and specifications for <br />Business Park North Street Rehabilitation. <br />• March 12, 2018 Resolution 8923 Approving the Plans and Specifications and <br />Authorize for Bidding. <br />This project was advertised for bid beginning on March 23, 2018 and bids were opened <br />at 10:00 a.m. on April 18, 2018. After the bid opening, Stantec reviewed and tabulated <br />the bids and has recommended Northwest Asphalt of Shakopee with a base bid of <br />$280,286.06 as the lowest responsive, responsible bidder be awarded the contract. The <br />list of bids and bidders is attached to this report. The plans and specifications included <br />two alternates for the construction process of the asphalt. This was based on the core <br />samples completed by American Engineering and Testing. The cost of Alternate 1 is <br />$427,462.00 and the cost for Alternate 2 is $461,142.00. Stantec recommends the City <br />select Alternate 1 in addition to the base bid. For a total of $707,748.06 for the Business <br />Park North Pavement Rehabilitation project. <br />Stantec has provided a fee estimate to provide engineering services for the construction <br />phase of this project. Those services include administration, engineering, inspection, <br />surveying and close out for this project. Compensation will be based on the actual hours <br />required plus reimbursable expenses for a maximum estimated fee of $19,973.50. <br />
The URL can be used to link to this page
Your browser does not support the video tag.