My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-08-2016 CC
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2016
>
02-08-2016 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:21 PM
Creation date
6/13/2018 4:03:47 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/8/2016
Supplemental fields
City Council Document Type
City Council Packets
Date
2/8/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No: 7A <br />Meeting Date: February 8, 2016 <br />Type of Business: Public Hearing <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: James Ericson, City Administrator <br />Item Title/Subject: Public Hearing – Consideration of Resolution 8506, a <br />Resolution Reapproving a Conditional Use Permit for a 150 <br />foot Cell Tower at 4860 Mustang Circle, Dell-Comm; Planning <br />Case CU2014-001 <br /> <br />Introduction: <br />The applicant and property owner, FAC Holdings, operating in Mounds View as Dell-Comm, <br />is requesting reapproval of a conditional use permit (CUP) to construct a 150 foot cell tower <br />on their property at 4860 Mustang Circle. Dell-Comm designs, furnishes and installs <br />telecommunications systems, applications and services. They have been in business since <br />1990 and do infrastructure cabling, fiber optic cabling, outside plant cabling, security <br />solutions and telephone systems. The City Council approved the CUP in September of 2014 <br />but due to issues with the FCC, the applicant was unable to proceed with the tower <br />construction within the required timeframe resulting in a lapse of the CUP. The issues with <br />the FCC have been addressed and the applicant is ready to move ahead with the <br />construction. <br /> <br />City Code Requirements: <br /> <br />Section 1124.03, Subd. 2: Allows for towers and antennae as a conditional use in specific <br />districts. Industrial districts allow towers and antennae up to 150 feet tall. <br /> <br />Section 1124.05 Subd. 1 Setbacks: The minimum setback from any property line or public <br />right-of-way for a wireless telecommunications tower is thirty feet (30’) unless abutting a <br />residential district, then at least half the height of the tower. When placed on a lot improved <br />with a principal building, the wireless telecommunications tower shall be located only in the <br />rear yard or interior side yards not abutting streets. Wireless telecommunication towers shall <br />not be placed between the principal building and any street abutting the property. Setbacks <br />for accessory equipment structures associated with wireless telecommunication towers and <br />antennae shall meet the requirements as outlined in Section 1104.01, subdivision 4 of the <br />Zoning Code. <br /> <br />Section 1125.01, Subd. 1e: The Planning Commission is required to review the possible <br />adverse effects of the requested conditional use. <br />Section 1125.01, Subd. 1g: which states that the Planning Commission shall make findings <br />of fact and recommend such actions or conditions relating to the request as it deems <br />necessary to carry out the intent and purpose of the Zoning Code and forward such findings <br />to the City Council.
The URL can be used to link to this page
Your browser does not support the video tag.