Laserfiche WebLink
Item No: 7A <br />Meeting Date: February 8, 2016 <br />Type of Business: Public Hearing <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: James Ericson, City Administrator <br />Item Title/Subject: Public Hearing – Consideration of Resolution 8506, a <br />Resolution Reapproving a Conditional Use Permit for a 150 <br />foot Cell Tower at 4860 Mustang Circle, Dell-Comm; Planning <br />Case CU2014-001 <br /> <br />Introduction: <br />The applicant and property owner, FAC Holdings, operating in Mounds View as Dell-Comm, <br />is requesting reapproval of a conditional use permit (CUP) to construct a 150 foot cell tower <br />on their property at 4860 Mustang Circle. Dell-Comm designs, furnishes and installs <br />telecommunications systems, applications and services. They have been in business since <br />1990 and do infrastructure cabling, fiber optic cabling, outside plant cabling, security <br />solutions and telephone systems. The City Council approved the CUP in September of 2014 <br />but due to issues with the FCC, the applicant was unable to proceed with the tower <br />construction within the required timeframe resulting in a lapse of the CUP. The issues with <br />the FCC have been addressed and the applicant is ready to move ahead with the <br />construction. <br /> <br />City Code Requirements: <br /> <br />Section 1124.03, Subd. 2: Allows for towers and antennae as a conditional use in specific <br />districts. Industrial districts allow towers and antennae up to 150 feet tall. <br /> <br />Section 1124.05 Subd. 1 Setbacks: The minimum setback from any property line or public <br />right-of-way for a wireless telecommunications tower is thirty feet (30’) unless abutting a <br />residential district, then at least half the height of the tower. When placed on a lot improved <br />with a principal building, the wireless telecommunications tower shall be located only in the <br />rear yard or interior side yards not abutting streets. Wireless telecommunication towers shall <br />not be placed between the principal building and any street abutting the property. Setbacks <br />for accessory equipment structures associated with wireless telecommunication towers and <br />antennae shall meet the requirements as outlined in Section 1104.01, subdivision 4 of the <br />Zoning Code. <br /> <br />Section 1125.01, Subd. 1e: The Planning Commission is required to review the possible <br />adverse effects of the requested conditional use. <br />Section 1125.01, Subd. 1g: which states that the Planning Commission shall make findings <br />of fact and recommend such actions or conditions relating to the request as it deems <br />necessary to carry out the intent and purpose of the Zoning Code and forward such findings <br />to the City Council.