My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-2016 CC
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2016
>
02-22-2016 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:32 PM
Creation date
6/13/2018 4:07:11 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/22/2016
Supplemental fields
City Council Document Type
City Council Packets
Date
2/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No. 07B <br />Meeting Date: February 22, 2016 <br />Type of Business: Council Business <br />City Administrator Review: ______ <br /> <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: Brian Erickson, P.E., Director of Public Works /City Engineer <br />Item Title/Subject: Resolution 8525, Approving Change Order with Hydro-Klean, LLC for <br />Sanitary Sewer Lining <br /> <br />Introduction <br />On May 26, 2015, City Council approved a contract with Hydro-Klean, LLC for slip lining approximately <br />6,200 linear feet of various diameter sewer lines. By lining these sections of sewer, their remaining <br />lifespan can be increased since the liner not only eliminates any ground water infiltration but adds <br />structural strength to the lines. Resolution 8421 awarded the contract in the amount of $240,030.81 <br />with a 4% construction contingency of $9,600.00 for a total amount not to exceed $249,630.81. <br /> <br />Discussion <br />During the course of construction, Hydro-Klean discovered a difficult area for lining on Pleasant View <br />Drive due to a large area with ground water infiltration. The amount of ground water, if not addressed, <br />would prevent the liner from curing properly and could have resulted in a failure similar to what <br />occurred along Ardan Avenue and Groveland Road in 2015. As a result Change Order 1 (CO 1), in the <br />amount of $5,930.00 was approved on September 24, 2015 for grouting five joints that were leaking. <br /> <br />During the work approved in CO 1 four additional leaking joints were identified and requiring grouting. <br />Because the work was in progress these joints were authorized to be added to the work. This resulted <br />in an additional cost of $3,880.00 to the project. Ultimately, because of the ground water pressure in <br />this area and the number of leaking joints, staff redirected Hydro-Klean to install the liner along the <br />sanitary main on County Road I. Prior to installation, Hydro-Klean was required to clean, prepare and <br />video the County Road I line. As they had already performed this work on Pleasant View, this resulted <br />in an additional cost of $3,997.48 for the project. As a result, there is a need for Change Order 2 (CO <br />2) in the amount of $7,877.48. <br /> <br />Currently, funding for this project is from the Sanitary Sewer Fund, 730-4823-7050. The amount <br />authorized under Resolution 8421 was $249,630.81. This leaves a shortfall of $4,257.48, which would <br />also come from the Sanitary Sewer Fund, 730-4823-7050. There is currently sufficient funding in the <br />budget to cover this cost. <br /> <br />The table on the following page summarizes the project costs and funding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.