My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2016/05/23
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2016
>
Agenda Packets - 2016/05/23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:04 PM
Creation date
6/13/2018 4:33:14 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
5/23/2016
Supplemental fields
City Council Document Type
City Council Packets
Date
5/23/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Ordinance 918 Discussion <br />May 23, 2016 <br />Page 2 <br /> <br />In 2014, Mayor Flaherty reached out to both the Spring Lake Park and Blaine Mayors to <br />ascertain whether their cities were still on board with the renaming project for County Road <br />10. Both cities expressed reluctance to participate given the high costs, with Spring Lake <br />Park responding in writing that they did not oppose the Northtown Boulevard name so long <br />as there was no implementation costs to their city. Mounds View was on its own to fund <br />the name change. <br /> <br />Discussion: <br /> <br />With the impending work to be done surrounding County Road H and 35W in addition to <br />the 35W Managed Lane Project, staff and the Council had revisited the signage and name <br />issue. If new signs need to be installed regardless due to construction, The City wondered <br />whether a new name could be incorporated at no additional expense to the City. MnDOT <br />was asked for lettering parameters, such as how many characters could be utilized on the <br />existing signs, without necessitating a wholesale sign and sign structure replacement. <br />Council member Meehlhause put together some information based on existing signage to <br />get a better understanding of how long a name could be. <br /> <br />On Monday, February 22, 2016, Mayor Flaherty, Council member Meehlhause and I met <br />with Ramsey County Commissioner Blake Huffman and County Engineer Jim Tolaas to <br />discuss County Road 10 and the role the County can play to help address signage issues <br />both on the corridor as well as on 35W. While some progress was made at the meeting, it <br />would take a second meeting on April 1, 2016, which included MnDOT staff, to receive <br />some positive news. With the proposed improvements to 35W close to being approved <br />and funded, MnDOT indicated that the City could likely count on new signs being erected <br />to include the new chosen name at no cost to the City. Other signage would be replaced <br />with the County Road H interchange reconstruction which is starting this June. <br /> <br />At the April 4, 2016 Work Session, the Council was updated as to the status of the name <br />change project and that a survey had been sent to all businesses on County Road 10. <br />(Survey responses were requested back to the City by April 15.) The responses were <br />reviewed with the City Council on April 25, 2016, and with just one exception, the <br />responses were unanimous in support of a change. Staff had also confirmed with the US <br />Post Office that if the name was changed to Mounds View Boulevard, mail would continue <br />to be delivered to the property regardless of whether the envelope indicated County 10, <br />Highway 10, County Highway 10 or Mounds View Boulevard. The direction from the <br />Council at that point was to move forward with the name change. <br /> <br />Recommendation: <br /> <br />Staff has prepared Ordinance 918, an ordinance which assigns a new name, “Mounds <br />View Boulevard”, to that section of CSAH 10 located within Mounds View, from County <br />Road H to Pleasant View Drive. Action requested for this meeting is to approve the first <br />reading and introduction of the ordinance. The public hearing, second reading and <br />adoption will be scheduled for June 13, 2016, Council meeting. Notices will be sent to <br />every property owner and occupant located on the corridor to let them know of the public <br />hearing and proposed name assignment.
The URL can be used to link to this page
Your browser does not support the video tag.