Laserfiche WebLink
EXHIBIT E <br /> SHE IMPROVEMENTS <br /> Site Improvements include the following types of expenses for the Development <br /> Property incurred by the Developer: <br /> Estimated Cost <br /> Erosion Control/Silt Fence $ 5,000 <br /> Site Clearing and Tree Removal 5,000 <br /> Soil Correction 25,000 <br /> Grading/Backfilling/Compaction of Fill 90,000 <br /> Sanitary Sewer 35,000 <br /> Ponding and Storm Sewer System 90,000 <br /> Retaining Walls 106,000 <br /> Paving- Include Costs of Base Construction excluding Asphalt 56,000 <br /> Landscaping and Irrigation Sprinkler System 60,000 <br /> Project Identification Signage 15,000 <br /> Soil Testing and Location Surveys 14,000 <br /> Environmental Costs,Assessments, Work Programs, ** <br /> Abatement/Clean-up <br /> Architectural/Design Fees (Site Only) 4,000 <br /> Engineering and Inspection Fees(Site Only) 12,000 <br /> Site Work Permit Fees 8,000 <br /> Total Estimated Cost $525,000 <br /> **No environmental issues or remediation costs are anticipated at this time. <br /> E b.vAo(RlAa)taros srw.a,a.a s <br />