My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1999/04/05
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1999
>
Agenda Packets - 1999/04/05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:16 PM
Creation date
6/14/2018 4:58:11 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/5/1999
Supplemental fields
City Council Document Type
City Council Packets
Date
4/5/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CC Workshop— Staff Report <br /> 8300 Fairchild Ave. —HRP <br /> April 5, 1999 <br /> property meets at least 1 of the 4 outlined criteria;it must also meet item numbers 5-8 of the policy to be considered <br /> for purchase by the EDA. As noted,the proposed property meets the criteria in item numbers 5,6 and 7 . The city <br /> has not yet proceeded with the requirements of item number 8,which requires a historical significance evaluation. <br /> This will be completed if the EDA requests staff to proceed with acquiring the property. <br /> DEMOLITION <br /> Demolition costs typically range from$5,000 to$10,000 depending on the size of the home,amount of hazardous <br /> material needing abatement,well sealing and tank abatement. Staff first sends out bid requests for hazardous <br /> materials assessment for the property and select a contractor for the required work. After completion of the <br /> hazardous materials assessment,staff then sends out bid requests to area demolition contractors to remove the <br /> structure(s)and perform the hazardous materials abatement. The EDA would then enter into agreements with the <br /> selected contractors for the required work. <br /> DISCUSSION <br /> The existing home has a single car attached garage and was originally built with an orientation toward Groveland <br /> Road. The back half of the lot was sold to the City for Groveland Park. The owner has subsequently built a two-car <br /> detached garage oriented toward Fairchild Avenue. The detached garage is in good condition and the owners have <br /> expressed interest in keeping the garage and relocating the structure within the lot to provide a better layout with the <br /> new home as well as complying with City Code setback requirements. <br /> The Pidels are also requesting that they be able to build the new home prior to the demolition of the existing home. <br /> A development agreement may be executed between the EDA and the Pidels ensuring that within a given period of <br /> time(i.e. 6 months)a second home may be built on the lot provided the existing home is demolished immediately <br /> following the reception of a certificate of occupancy on the new home. Therefore the owners would not be required <br /> to fmd alternative housing during the construction of their new home. Funds for demolition would not be made <br /> available to the owners until the building is cleared. <br /> The Pidels indicate they have explored options for remodeling their home by expanding and updating their existing <br /> space. They contend the estimates they have received to remodel are very high and makes remodeling cost <br /> prohibitive. The Pidels believe that demolishing their existing home and building new would be the best scenario <br /> for both them and the City. <br /> ACTION TO BE CONSIDERED <br /> 1) Approve the request for participation in the Housing Replacement Program for the property located at 8300 <br /> Fairchild Avenue and direct staff to draft a redevelopment agreement and prepare a resolution authorizing <br /> funding for the demolition of the single family home for the purposes of constructing a new home by the current <br /> owner based on approved design criteria. <br /> 2) Deny the request for participation in the Housing Replacement Program,which would authorize funding for <br /> demolition of the existing home and direct staff to draft a resolution denying the request. <br /> Steve Dorgan, ing Inspector <br /> 612/717-4023 <br /> email steved@rcmnet.org <br /> Attachments: 1) Location Map—8300 Fairchild Avenue <br /> 2) Letter of Request—Sandi and Christopher Pidel <br />
The URL can be used to link to this page
Your browser does not support the video tag.