Laserfiche WebLink
• Axti, -- . - - Lej--- --- U17 <br /> c, Advise SEH and CONTRACTOR of the commencement of any <br /> Work requiring a Shop Drawing or sample if the submittal has not <br /> been approved by SEH. <br /> • <br /> 5. Review of Work,Rejection of Defective Work,Inspections and Tests: <br /> a. Conduct on-site observations of the Work in progress to assist SEH <br /> in determining if the Work is in general proceeding in accordance <br /> with the Contract Documents. <br /> b. Report to SEH whenever RPR believes that any Work is unsatisfac- <br /> tory, faulty or defective or does not conform to the Contract Docu- <br /> • ments, or has been damaged, or does not meet the requirements of <br /> any inspection, test or approval required to be made; and advise <br /> SEH of Work that RPR believes should be corrected or rejected or <br /> should be uncovered for observation, or requires special testing, in- <br /> spection or approval. <br /> c. Verify that tests, equipment and systems start-ups and operating <br /> and maintenance training are conducted in the presence of appro- <br /> priate personnel, and that CONTRACTOR maintains adequate <br /> records thereof; and observe,record and report to SEH appropriate <br /> details relative to the test procedures and start-ups. <br /> d. Accompany visiting inspectors representing public or other agen- <br /> cies having jurisdiction over the Project, record the results of these <br /> inspections and report to SEH. <br /> 6. Interpretation of Contract Documents: Report to SEH when clarification <br /> and interpretations of the Contract Documents are needed and transmit to <br /> CONTRACTOR clarifications and interpretations as issued by SEH. <br /> 7. Modifications: Consider and evaluate CONTRACTOR's suggestions for <br /> modifications in Drawings or Specifications and report with RPR's recom- <br /> mendations <br /> ecommendations to SEH. Transmit to CONTRACTOR decisions as issued by <br /> SEH, <br /> Page No. 16 November X7,1993 <br />