My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1999/03/01
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1999
>
Agenda Packets - 1999/03/01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:41 PM
Creation date
6/14/2018 5:43:00 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
3/1/1999
Supplemental fields
City Council Document Type
City Council Packets
Date
3/1/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Axti, -- . - - Lej--- --- U17 <br /> c, Advise SEH and CONTRACTOR of the commencement of any <br /> Work requiring a Shop Drawing or sample if the submittal has not <br /> been approved by SEH. <br /> • <br /> 5. Review of Work,Rejection of Defective Work,Inspections and Tests: <br /> a. Conduct on-site observations of the Work in progress to assist SEH <br /> in determining if the Work is in general proceeding in accordance <br /> with the Contract Documents. <br /> b. Report to SEH whenever RPR believes that any Work is unsatisfac- <br /> tory, faulty or defective or does not conform to the Contract Docu- <br /> • ments, or has been damaged, or does not meet the requirements of <br /> any inspection, test or approval required to be made; and advise <br /> SEH of Work that RPR believes should be corrected or rejected or <br /> should be uncovered for observation, or requires special testing, in- <br /> spection or approval. <br /> c. Verify that tests, equipment and systems start-ups and operating <br /> and maintenance training are conducted in the presence of appro- <br /> priate personnel, and that CONTRACTOR maintains adequate <br /> records thereof; and observe,record and report to SEH appropriate <br /> details relative to the test procedures and start-ups. <br /> d. Accompany visiting inspectors representing public or other agen- <br /> cies having jurisdiction over the Project, record the results of these <br /> inspections and report to SEH. <br /> 6. Interpretation of Contract Documents: Report to SEH when clarification <br /> and interpretations of the Contract Documents are needed and transmit to <br /> CONTRACTOR clarifications and interpretations as issued by SEH. <br /> 7. Modifications: Consider and evaluate CONTRACTOR's suggestions for <br /> modifications in Drawings or Specifications and report with RPR's recom- <br /> mendations <br /> ecommendations to SEH. Transmit to CONTRACTOR decisions as issued by <br /> SEH, <br /> Page No. 16 November X7,1993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.