My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1999/02/01
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1999
>
Agenda Packets - 1999/02/01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:12 PM
Creation date
6/14/2018 6:01:45 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/1/1999
Supplemental fields
City Council Document Type
City Council Packets
Date
2/1/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Overall quality <br /> -City wants the project done right. <br /> -Architect explains the first direction of the city was to design a very cost effective project. <br /> The current pricing reflects this concept. <br /> -City wants to create a number of add alternates for the project, i.e., <br /> brick on the exterior • <br /> etching on spancrete <br /> partition walls in the open area <br /> A)structural elements <br /> B)partitions later <br /> - Estimated cost increases, $250,000.00 to $300,000.00. <br /> -No soil borings have been ordered prior to this date,therefore no soil correction <br /> dollars have been added to the project. <br /> -Separation is felt very important between the city and VB Diggs space. This was <br /> mainly for security reasons. <br /> • The Teen Center: <br /> -The original concept construction costs had the city direct that half of the teen center be allotted <br /> to the city and half to VB Diggs--reason: the entry was to be shared by both parties. <br /> -Concern for control/safety brought a decision from the City that the entire teen center <br /> --• would be put underneath the City cost. Expense for the teen center/lobby is <br /> approximately$210,000.00 additional to the City costs. <br /> • General <br /> -VB Diggs is to match the exterior of the City materials. <br /> • <br /> -WAI/Continuum to present schedule and new probable cost adjustments. <br /> • Fee Adjustments <br /> -Add alternates require 80%of architectural fees if not used--100%if accepted. <br /> Initial invoicing will reflect 100%and will be adjusted accordingly. <br /> -Separating Children's Home Society will require increased fee percentage due to the <br /> size of the project-repetitive work is required at different schedules -also shown in 12.1 of the <br /> B141 Owner Architect contract. <br /> If there are any corrections to the above meeting minutes, please respond within ten working <br /> days of this memo or they will be considered correct. <br /> E:1WOR.D\90634\MTGtiIIi I.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.