Laserfiche WebLink
BEL-RAE COMMUNITY CENTER #90634 <br /> V.B. Diggs (Volleyball) <br /> Opinion of Probable Costs <br /> V.B. Diggs, New Construction <br /> Courts 24,000 sq.ft. x $55.00 /sq. ft. _ $1,320,000.00 <br /> 1st floor commons/ancillary 7,000 sq.ft. x $55.00 /sq. ft. _ $385,000.00 <br /> (v.ball toilets/concessions/support) <br /> 2nd floor commons/balcony 7,500 sq.ft. x $50.00 /sq. ft. _ $375,000.00 <br /> (open area/balcony/concessions) <br /> Ext. Wall Upgrade (V.B.Diggs 1 Is $45,000 = $45,000.00 <br /> Lobby/Entry/Corridor 1,500 sq.ft. x $55.00 /sq.ft. _ $82,500.00 <br /> (entry/lobby/corridor) <br /> Sitework/Parking 1 Is $75,000 = $75,000.00 <br /> SUBTOTAL-New Construction Costs $2,282,500.00 <br /> SUBTOTAL $2,282,500.00 <br /> 2% Design Contingency $45,650.00 <br /> V.B.DIGGS CONSTRUCTION COST $2,328,150.00 <br /> SUMMARY <br /> CITY CONSTRUCTION COST (with alternates) $3,502,297.50 <br /> V.B.DIGGS CONSTRUCTION COST $2,328,150.00 <br /> II I <br /> TOTAL CONSTRUCTIONI COST $5,830,447.50 <br /> Page 6 <br />