Meeting Minutes <br /> Page2 <br /> Wetlands Issue: <br /> - A problem regarding wetlands on the proposed site arose at a <br /> Creek Watershed District on January 19, 1998 meeting with the Rice <br /> - Attending the meeting were representatives from the Watershed <br /> Keehn, SHE _ City consultant; District; Rocky <br /> and their civil engineer. Mike Ulrich, City of Mounds View, W <br /> - Based on existing data from the Watershed District, Continuum <br /> classified as a wetland area. If this data is correct, buildingon t <br /> allowed unless the wetlands were replaced. a portion of the Bel-Rae site is <br /> - The information provided to W his area would not be <br /> show anyAI/Continuum and its consultants by the City did not <br /> wetlands on the parcel of property in <br /> questionindications brought forth that the site contained a wetland area. nor Documewene anyother <br /> wetland existed to the south of the property was provided. tati n that a <br /> - Rocky Keehn, the City's consultant from SHE, indicated that <br /> report for the site to the south of the property shows the wetland on that <br /> the Bel-Rae site was not included in the wetland a wetland delineation <br /> information on the site was collected. delineation report and therefore not <br /> - A wetland delineation report will be required for the Bel-Rae site. Again, this report <br /> cannot happen until Spring. If the report indicates that a portion of the <br /> site is <br /> area, the parking plan as drawn would have to be modified or the Citya havewetland <br /> o <br /> t <br /> mitigate the site would to <br /> - To keep the current project on schedule, it should be <br /> possible to permit for the construction of the new addition prior to the resolution obtain a buildingt <br /> issue. Revised site and gradingplanson of the wetland <br /> Watershed District indicating a ducton in the becould developedand submitted to the <br /> identified as a wetland area. This would allow for the constructs <br /> on ofg, avoiding the area potentially <br /> some parking, maintaining the schedule required for Community <br /> the buildingc withn <br /> occupancy. To complete this work, revisions and/or new drawings will be <br /> - the site plan and civil grading/drainage drawingsCommunity Education <br /> Supplemental services will be requiredgfortheseosebrva obtain permit. required for <br /> un exceed four thousand six hcost for this will be <br /> billed on an hourly rate not to <br /> ($4,650). hundred and fifty dollars <br /> - Based on the information provided, a motion was made to accept <br /> letter of January 20, 1998, requesting WAUContinuum's <br /> • <br /> site/grading/drainage plans, maintaining the approxinmatela area of the Services for revising <br /> plans would be utilized to obtain a Watershed permit to start the <br /> project. Motion passed. wetlands. These <br /> construction on this <br />