My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1999/08/23
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1999
>
Agenda Packets - 1999/08/23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:38 PM
Creation date
6/14/2018 6:43:51 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/23/1999
Supplemental fields
City Council Document Type
City Council Packets
Date
8/23/1999
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� . • •. •ter• .• • • ••• • • � •. • . A• -• . . .. <br /> The fee for this street opening shall be ten dollars ($10.00). (1988 Code §11.01) <br /> 902.053: DRIVEWAY CONSTRUCTION: <br /> Subd. 1. General Construction: The following procedure and specifications shall be <br /> required for all gravel, concrete or asphalt driveway construction from streets to <br /> private garages: <br /> a. Excavation: The driveway shall be excavated to remove all black dirt from the <br /> area to be surfaced. <br /> b. Drainage Provisions: The driveway shall be constructed so as to provide <br /> drainage from the garage to the street unless a variance is granted by the Building <br /> Inspector2. <br /> Subd. 2. Gravel Construction: After initial excavation, the driveway construction shall <br /> consist of a minimum of four inches (4") of Class 2 crushed rock (3/4" down) <br /> compacted in place. <br /> Subd. 3. Concrete Construction: <br /> a. After initial excavation, the driveway shall be backfilled with Class 4 base <br /> material, compacted in place, to an elevation four inches (4") below the finished <br /> surface grade of the driveway. <br /> b. The driveway construction shall consist of a minimum of four inches (4") of three <br /> thousand five hundred(3,500)pound mix,four inch(4") slump with air. <br /> Subd. 4. Asphalt Construction: <br /> a. After initial excavation, the driveway shall be backfilled with Class 4 base <br /> material, compacted in place, to an elevation four inches (4") below the finished <br /> surface grade of the driveway. <br /> b. The driveway construction shall consist of a minimum of two inches (2") <br /> (compacted thickness), Class 5 base material and a minimum of two inches (2") <br /> 2 See Chapter 1302 of this Code for storm water management requirements. <br /> SJR-167412 <br /> MU210-42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.