My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1999/09/20
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1999
>
Agenda Packets - 1999/09/20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:05 PM
Creation date
6/14/2018 6:56:58 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
9/20/1999
Supplemental fields
City Council Document Type
City Council Packets
Date
9/20/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
THU 16:43 FAX 651 490 2150 SEH 0002 <br /> ��• MEMORANDUM <br /> 3535 Vadnais Center Drive,200 SEH Center,St.Paul,MN 55110.5118 851.490.2000 800.325.2055 851.490,2150 FAX <br /> TO: Kevin Carroll,Economic Development Coordinator <br /> FROM: Rocky Keehn,PE <br /> DATE: July 15, 1999 <br /> RE: Cost estimate for Mermaid Site Redevelopment Water Quality Pond Analysis <br /> SEH No.T-MOUND9800.00 <br /> Per your request, we have prepared a scope of services and cost estimate to prepare a preliminary <br /> water quality management plan for the Mermaid Site Redevelopment. Following is our estimate of <br /> the items that will need to be completed for the project. <br /> Scope of Services: <br /> • Meeting with City and Developer <br /> • Review existing drainage system <br /> • Analyze proposed alternatives (assume three) <br /> Prepare preliminary letter report <br /> • Meeting with City and Developer to review preliminary findings <br /> • Meeting with agencies to discuss proposed option <br /> • Revisions to hydrologic model of final option chosen <br /> • Final letter report <br /> The estimated cost to complete the work is$4500. It was assumed that our time for each meeting <br /> would be about 3 hours. Our.Senior Water Resources Engineer would be the only SEH staff person <br /> to attend the meetings. The meeting time includes preparation, travel and actual meeting time. <br /> The project cost may be less if the number of options is reduced or some of the meetings are <br /> eliminated.. On the other hand, cost could increase if several new options are proposed after the <br /> preliminary study is completed or the number of meetings are increased. <br /> If you have any questions please call me at 651-490-2026. <br /> RJK/rjk/BCP <br /> cc:Steve Campbell,SEH <br /> Short Elliott Hendrickson Inc. • Offices located throughout the Upper Midwest • Equal Opportunity Employer <br /> We help you plan,design,and achieve <br />
The URL can be used to link to this page
Your browser does not support the video tag.