Laserfiche WebLink
• <br /> Item No. <br /> Staff Report No. • <br /> Meeting Date: July 6, 1999 <br /> Type of Business: W.K. <br /> . WK: Work Session;PH:Public Hearing; <br /> CA:Consent Agenda;CB: Council Business <br /> City of Mounds View Staff Report <br /> To: Honorable Mayor and City Council• <br /> From: Michael Ulrich, Director of Public Works <br /> Item Title/Subject: Review of Streets Policies <br /> Date of Report: August 18, 1999 <br /> Staff has copied the staff report that was for the public hearing on June 28 to this report. It <br /> highlights some of the changes that will be necessary to adopt the various recommendation of the <br /> Street Committee. <br /> Two major items recommended by the committee were to consider the existing design/width of <br /> the particular street section the standard by which future projects would begin at. This change <br /> would require a resolution amending the resolution that earlier set the construction standards for <br /> all streets. The second recommendation of the committee was to lower the percentage assessed to <br /> the property owners from 50%to 20 -25%. This percentage (50%), is the same for water and <br /> wastewater main replacement/improvement. This reduction would require an amendment to the <br /> Ordinance that established the current percentage. <br /> Staff will seek Council's direction for preparation of these amendments following the Public <br /> Hearing. Staff has requested budgetary quotes from a couple of construction companies for <br /> various pavement rehabilitation methods. These estimates may prove helpful to Council in <br /> determining any percentages of assessments for various rehab methods. In an effort to reduce a <br /> lump sum street or utility assessment, staff is seeking input from Council regarding a possible <br /> wastewater system improvement flat charge and possibly a referendum question on the 2000 <br /> election ballot for additional tax increase beyond the levy limits forfuture street improvements. <br /> This question could provide`valuable input to'the City Council and residents as to the direction <br /> the City should proceed in it's future street projects. <br /> Staff has received few of the pavement rehabilitation method cost estimates for Council's review <br /> and comments. These estimates are based on a street width of 28,just for average calculations. <br /> Actual street widths would be adjusted accordingly. The various strategies for rehab are <br /> recommended based on the Pavement Condition Index(PCI). If the PCI is higher,the required <br /> • amount of the pavement repair and preparation will be less,thereby lower the amount of the <br /> improvement. The improvement estimates are listed from high PCI to low. <br /> * Method#1 1 '/2" Overlay @ $3.60/sq.yd <br /> $11.20 per foot for total width <br /> $ 5.60 per foot for Y2 street width(one side) <br /> $448.00 improvement cost for typical 80' lot <br />