Laserfiche WebLink
Sunrise Staff Report <br /> December 8, 1999 <br /> Page 6 <br /> The expansion areas will be of brick construction and will match the exterior of the existing <br /> building. The total area of the expansion planned is 7,477 square feet for a total build out area of <br /> 20,464 after project completion. There will be a new covered entryway that connects to a new <br /> drop-off point adjacent to the parking lot, an expansion and reorientation of the sanctuary to <br /> increase seating capacity to 368 from the existing 275. <br /> There will be an expansion to accommodate additional space for Sunday school services. A <br /> kitchen area will be added along with some multi-purpose space, conference rooms, and office <br /> space for the Pastor and Church staff. There will not be an increase in services provided by the <br /> facility other than being able to accommodate more members in the sanctuary at a single service, <br /> thus the additional number of parking stalls required by this expansion will be limited to the <br /> increased seating capacity of the sanctuary. <br /> Wetland Buffer: <br /> The construction and expansion activities on the site will not encroach into the 100-foot wetland <br /> buffer, thus no permits of that sort are necessary. <br /> Landscaping: <br /> While there are no explicit plans showing proposed landscaping, the Church does plan on <br /> replacing the landscaping that would be removed with similar materials. Because the extent of the <br /> expansion is minimal considering the total lot area, and because there is already extensive <br /> landscaping provided that would remain after the expansion, staff is not requiring the applicant to <br /> submit anything formal in this regard. <br /> Other Site Conditions: <br /> Neither the parking lot nor the existing lighting will be altered with this proposal. No changes are <br /> being proposed with regard to signage of other site conditions. <br /> Access: <br /> The Church takes sole access from Long Lake Road, with two entry points more than 200 feet <br /> from the intersection of County Road I and Long Lake Road. No changes are proposed at this <br /> time to the parking lot or curb cuts. <br /> Recommendation: <br /> Given that the general and specific conditional use permit requirements are met, that the adverse <br /> effects criteria are adequately addressed and that the dimensional requirements are met and <br /> satisfied, save for the non-conforming parking lot setback, Staff and the Planning Commission <br /> recommend that the City Council approve Resolution 5387, a resolution approving the CUP and <br /> Development Review request of Sunrise United Methodist Church, as presented by Vanman <br /> Companies. <br /> Jos ,, ElQiU(A641 <br /> James Ericson, Planning Associate <br /> N:\DATA\GROUPS\COMDEV\DEVCASES\574-99\SUNRISE.CC2 <br />