My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-24-1997 EDA
MoundsView
>
Commissions
>
Economic Development Authority
>
Agenda Packets
>
1990-1999
>
1997
>
11-24-1997 EDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 9:16:35 AM
Creation date
6/15/2018 5:35:49 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
Economic Development Authority
Commission Doc Type
Agenda Packets
MEETINGDATE
12/24/1997
Commission Doc Number (Ord & Res)
0
Supplemental fields
Date
12/24/1997
EDA Document Type
Council Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
410 <br /> cies beyond the local community; and which ideas are the most <br /> unique. They will be asked to guide the consultant toward corridor <br /> elements that best fit the community. <br /> • The alternative (or a combination of aspects of any of the <br /> alternatives) that workshop participants feels is the most appro- <br /> priate and best reflection of the community will be refined into a <br /> final concept design. Estimates of costs will also be defined as a <br /> part of this stage of the work. The final concept design will be <br /> presented at the end of the process in a community presentation. <br /> Define the Next Steps— <br /> The intent of this process is to a create acceptable, unique <br /> and meaningful design concept for the Highway 10 corridor in <br /> Mounds View. But to this point,there is only a concept. In order <br /> to move forward,HKGi would define the responsibility and pro- <br />' cedures for each element of the enhancement program;that is,we410 <br /> will describe whether the enhancement is to be accomplished by <br /> the private sector,the City of Mounds View,another jurisdiction <br /> outside of the city,a local service group or organization,or some <br /> combination of public agency, local groups and individuals. We <br /> will determine the level of design or review that will be required <br /> to ensure the accepted concepts are followed. This will provide <br /> for consistency in the development of an image, and continuity <br /> with the community's vision for the Highway 10 corridor as de- <br /> i fined through the focus group process. <br /> 1 <br /> Asa final step in the process.HKGi will work with city staff <br /> to set priorities for various enhancements, strategize funding op- <br /> portunities and develop a timeline for implementation. <br /> The products of this project will be a series of drawings, il- <br /> lustrations. diagrams and other graphics that portray.the possi- <br /> bilities for Highway 10 corridor enhancements. The emphasis <br /> will be on communicating the qualities of each element,and how . <br /> individual elements work to reinforce the image and identity of <br /> Hoisington Koester Group Inc ©© <br /> gill <br /> Dare <br />
The URL can be used to link to this page
Your browser does not support the video tag.