Laserfiche WebLink
• City of Mounds View-Request for Proposals <br /> Highway 10 Design Theme <br /> Juiy 7, 1997 . <br /> Page 3 <br /> SCOPE OF PROJECT: <br /> The scope of the project would include the following: <br /> 1. Visual evaluation of conditions on properties fronting Highway 10 for purposes of <br /> assessing the feasibility of implementing a design theme and the type of theme which <br /> would be appropriate. Attention would be given to type of land use, property <br /> condition,natural features, and amount of land available for implementing a desian <br /> theme. For example,notations would be made where existing improvement such as <br /> buildings and parking lots are situated relative to the Highway right-of-way line. The <br /> area to be assessed would be the north and south sides of Highway 10 between County <br /> Road H2 to Silver Lake Road. Notations on constraints to the implementation of a <br /> design theme should be included. The information from the visual evaluation would be <br /> mapped or otherwise synthesized. <br /> An exacting study is not expected. The City would make available development plans <br /> on file with the City, aerial photographs, drawings showing approximate location of <br /> • buildings and structures from Ramsey County. The.idea is to identify where there are <br /> none to minor to severe limitations on fitting design improvements, and to give <br /> consideration to adjacent site conditions in developing the design theme. <br /> 2. Tour of the City to assess its general character and the impact of the Highway 10 <br /> corridor. Review of the sketch plan for the Ring Road concept developed during t <br /> University of Minnesota design course. <br /> 3. Review of the active development plans for sites in the Highway 10 corridor to assess <br /> and make recommendations on how the design theme could be coordinated with these <br /> development plans. <br /> 4. Preparation of two or three concept plans for a design theme along Highway 10, with <br /> attention to specific conditions in the corridor and illustrating both a formal and <br /> informal tream,e,r for the corridor. The design theme should include proposals for <br /> landscaping,lighting, signage,fencing, and street furniture as deemed appropriate by <br /> the designer. A suggested color scheme should be included. The design theme should <br /> also include details showing how the gateways at Silver Lake Road and Edgewood <br /> Drive, and the major intersections at Long Lake Road and County Road I wou <br /> treated. <br /> S. Perspective renderings or simulations of key locations in the Highway 10 corridor to <br /> • illustrate the visual impact of the design theme. <br /> 6. Attendance at least one ming with the Planning Commission and Economic <br /> Development Commission, and one meeting with the Economic Development <br /> Authority to present and discuss the design theme alternatives. Attendance at one <br /> community forum on the design theme. <br />