Laserfiche WebLink
Bridges Technology Park Phase II <br /> Planning Case 514-98 <br /> April 27, 1998 <br /> Page 2 <br /> Drainage. Wetland Considerations and Wetland Buffer Permit: <br /> This lot was platted as part of the North Star Industrial Park 2nd Addition. At the time of <br /> platting, a comprehensive drainage plan was prepared which identified the ponding requirements <br /> for Lots 1, 2 and 3. The major wetland along the western boundary of these lots was also <br /> delineated at that time. The applicant is proposing a drainage system which coordinates with the <br /> earlier plan. There will be a storm drain at the rear of the building to capture the building a <br /> parking lot runoff, directing it to the existing stormwater retention/detention pond behind the <br /> existing building. The runoff in the front of the building will drain into a catch basin which is then <br /> directed to the City of Blaine's storm sewer under Coral Sea Street. <br /> Because work is being done within 100 feet of the wetland, the applicant will need to have a <br /> wetland buffer permit approved by the City. According to the site plans, the new parking area <br /> and drive aisles will be a minimum of ten feet from the delineated edge of the wetland. Nowhere <br /> will the construction encroach into the wetland. The existing building and parking lot come <br /> within 18 feet of the wetland, but no closer. Rice Creek Watershed District has reviewed the <br /> applicant's drainage plans and has approved the issuance of a watershed district permit for the <br /> site. <br /> Parking: <br /> The parking ratios as required in the City Code for office and warehouse uses are as follows: <br /> Office: 3 spaces plus 1 per 175 square feet of floor area <br /> Warehouse: 8 spaces plus 1 per 500 square feet of floor area <br /> The applicant has provided a master site plan for both lots 2 and 3 showing the parking for the <br /> existing and proposed buildings. Altogether, a total of 200 spaces would be required for both <br /> buildings, with a total of only 168 stalls being proposed. The remaining 32 required stalls are <br /> shown as "proof of parking" on the master site plan, along with 14 additional stalls as future <br /> parking, for a total of 46 future stalls. The proof of parking can be allowed with the approval of a <br /> variance by the Planning Commission. Utilizing proof of parking to reduce the number of parking <br /> stalls constructed on the site will serve to lessen the potential impact to the natural environment. <br /> Last year, the Planning Commission approved a similar variance for neighboring ZEP <br /> manufacturing by adjusting the office and warehouse parking ratios on the condition that the <br /> spaces be constructed if needed in the future. The parking ratios would be adjusted as follows to <br /> allow for the provision of 169 stalls. The site plan shows 171 stalls and thus would beet the <br /> revised ratios. <br /> Office: 3 spaces plus 1 per 175 square feet of floor area= 3 + 93 = 96 <br /> Warehouse: 8 spaces plus 1 per 750 square feet of floor area= 8 + 65 = 73 <br /> 169 <br />