My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1998/04/27
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1998
>
Agenda Packets - 1998/04/27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:39 PM
Creation date
6/15/2018 10:40:47 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/27/1998
Supplemental fields
City Council Document Type
City Council Packets
Date
4/27/1998
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bridges Technology Park Phase II <br /> Planning Case 514-98 <br /> April 27, 1998 <br /> Page 2 <br /> Drainage. Wetland Considerations and Wetland Buffer Permit: <br /> This lot was platted as part of the North Star Industrial Park 2nd Addition. At the time of <br /> platting, a comprehensive drainage plan was prepared which identified the ponding requirements <br /> for Lots 1, 2 and 3. The major wetland along the western boundary of these lots was also <br /> delineated at that time. The applicant is proposing a drainage system which coordinates with the <br /> earlier plan. There will be a storm drain at the rear of the building to capture the building a <br /> parking lot runoff, directing it to the existing stormwater retention/detention pond behind the <br /> existing building. The runoff in the front of the building will drain into a catch basin which is then <br /> directed to the City of Blaine's storm sewer under Coral Sea Street. <br /> Because work is being done within 100 feet of the wetland, the applicant will need to have a <br /> wetland buffer permit approved by the City. According to the site plans, the new parking area <br /> and drive aisles will be a minimum of ten feet from the delineated edge of the wetland. Nowhere <br /> will the construction encroach into the wetland. The existing building and parking lot come <br /> within 18 feet of the wetland, but no closer. Rice Creek Watershed District has reviewed the <br /> applicant's drainage plans and has approved the issuance of a watershed district permit for the <br /> site. <br /> Parking: <br /> The parking ratios as required in the City Code for office and warehouse uses are as follows: <br /> Office: 3 spaces plus 1 per 175 square feet of floor area <br /> Warehouse: 8 spaces plus 1 per 500 square feet of floor area <br /> The applicant has provided a master site plan for both lots 2 and 3 showing the parking for the <br /> existing and proposed buildings. Altogether, a total of 200 spaces would be required for both <br /> buildings, with a total of only 168 stalls being proposed. The remaining 32 required stalls are <br /> shown as "proof of parking" on the master site plan, along with 14 additional stalls as future <br /> parking, for a total of 46 future stalls. The proof of parking can be allowed with the approval of a <br /> variance by the Planning Commission. Utilizing proof of parking to reduce the number of parking <br /> stalls constructed on the site will serve to lessen the potential impact to the natural environment. <br /> Last year, the Planning Commission approved a similar variance for neighboring ZEP <br /> manufacturing by adjusting the office and warehouse parking ratios on the condition that the <br /> spaces be constructed if needed in the future. The parking ratios would be adjusted as follows to <br /> allow for the provision of 169 stalls. The site plan shows 171 stalls and thus would beet the <br /> revised ratios. <br /> Office: 3 spaces plus 1 per 175 square feet of floor area= 3 + 93 = 96 <br /> Warehouse: 8 spaces plus 1 per 750 square feet of floor area= 8 + 65 = 73 <br /> 169 <br />
The URL can be used to link to this page
Your browser does not support the video tag.