Laserfiche WebLink
JAN-19-98 01 :23 PM WAI 612 223 5370 Pe02 <br /> January 8, 1998 WA I <br /> Continuut11 <br /> Mr. Chuck Whiting <br /> City Administrator ARCHITECTURAL DESIGN <br /> City of Mounds View PROJECT MANAGEMENT <br /> Mounds View,Minnesota CONSTRUCT#ON SERVICES <br /> MASTER PLANNING <br /> INTERIOR DESIGN <br /> RE: Mounds View Community Center """' <br /> Bel-Rae Ballroom <br /> Alternates <br /> Project #90634 <br /> FAX TRASMITTAL <br /> Dear Chuck: <br /> With respect to the above referenced project the following items are presented for your information. <br /> At the City Council meeting on December 15, 1997,it was indicated that the budget for the total project was <br /> fixed at the$4 million level(Phase 1 of the project cost was approximately$900,000). The cost to reroof the <br /> existing building was to be included in this amount. Should the cost of the project exceed the budgeted <br /> amount,bid alternates would be included to allow the City to choose which items would be included in the <br /> project, <br /> Preliminary cost quotations for the project were prepared by Flannery Construction(project Construction <br /> Managers)for the building based on the Design Development documents.The preliminary costs showed the <br /> project over budget. <br /> After a review of the cost quotations and the documents,a number of proposed items were evaluated, <br /> adjusted,redefined or were eliminated. These changes did not affect the program or the original scope of <br /> work for the project. <br /> However,even with these revisions the project appears to be slightly over budget by approximately <br /> $120,000.These costs appear to be related to additional site work that was indicated in the Soils Report for <br /> the project. These costs were not budgeted for due to the late delivery of the report. The report was requested <br /> by WAI in April 1997,with delivery in June 1997.The report was finally completed and delivered in <br /> September 1997. <br /> Per WAI Meeting Minutes,April 21, 1997,any soil correction dollars required have not been added to the <br /> project.The Soils Report indicates that soil correction is required,including but not limited to: excavating <br /> existing fill and topsoil and compacting new fill for foundation and floors,soil fill and compaction for <br /> pavement areas,water removal during site grading and footing construction and additional paving thickness <br /> due to soil condition. <br /> Upon receipt and review of the cost quotation,the exact extent of the soil correction dollars is now apparent. <br /> The budget for the project was capped at the$4 million level. Since this cost does not reflect the soils <br /> correction dollars,additional cost reductions are required to maintain the construction budget. <br /> In an attempt to keep the project on budget the following preliminary list of alternates have <br /> been prepared for the City's review. These items will included design elements that are not 381 Ens$i<PIIogg Blvd <br /> included in the base bid contract,but will be listed as additive or deductive elements to the SI.Paul.Mir n,usr„aha 55101 <br /> base bid,allowing each itemized costs to be compared and if possible,selected to reach the Fele 6l2•223.6092 <br /> desired construction cost. 612.27.0644 <br /> WIsc onsIn Office <br /> 2125 Altoona Avenue <br /> Eau Claire,Wisconsin 54701 <br /> MN and W 1.800-B45-0754 <br />