My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1998/01/26
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1998
>
Agenda Packets - 1998/01/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:06 PM
Creation date
6/18/2018 5:32:20 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
1/26/1998
Supplemental fields
City Council Document Type
City Council Packets
Date
1/26/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JAN-19-98 01 :06 PM WAI 612 223 5370 P. 04 <br /> • <br /> n <br /> c't)MMl:kc'iAl. J, , . 1 M:tiiiyr:rvUAL <br /> January 13, 1998 <br /> TO: Chuck Whiting <br /> FROM: Tim Dunnwald <br /> RE: Belrae Ballroom Roof <br /> I have been asked to provide you with any information I have on the roof <br /> repairs on the Belrae Ballroom. <br /> On June 3, 1997 at our pre-bid walk through we noticed water damage on the <br /> ceiling tile and some evidence of water on the floor. <br /> On June 27, 1997 a contractor repaired the roof where the old rooftop units <br /> were removed. I asked the contractor to track down three roof leaks that we <br /> could see. <br /> On June 28, 1997 the contractor found three possible leaking areas of the <br /> membrane. We were informed there was glass under the gravel and that was the <br /> likely reason for the leaks, He was told to repair the leaks. <br /> On June 30, 1997 while the roofer was onsite to repair the three leaks in the <br /> membrane, he found an area over the daycare that was deteriorated. It was the <br /> roofer's opinion that this deterioration was caused by oil from an old rooftop <br /> compressor that had been serviced in the past, He was told to repair the <br /> damage. <br /> On July 23, 1997 the roofer was asked to repair two new leaks over the daycare <br /> area. <br /> On October 10, 1997 I had a meeting with a representative from Carlisle Roof <br /> and Tim Pitman. The rep thought the roof and roof flashings were in very good <br /> condition. We scraped some of the gravel back and found additional glass <br /> fragments. When we asked for a possible solution, he suggested the only <br /> solution would be to replace the roof. He thought it would be possible to <br /> replace just the field and not the flashings, but also said that if we <br /> selected this solution we would not have a warranty on the roof. I relayed <br /> this information to Cathy Bennett and decided to look at roof replacement in <br /> Phase II of the renovation. <br /> Please let me know if I can provide further information or be of help to you. <br />
The URL can be used to link to this page
Your browser does not support the video tag.