Laserfiche WebLink
, 7E- <br /> REPORTS <br /> JAN-21-1996 11°02 METRO. AIRPORT COMM. <br /> I <br /> REPORTS A <br /> • <br /> METROPOLITAN AIRPORTS COMMISSION <br /> PLANNING AND ENVIRONMENT.COMMITTEE. <br /> REGULAR MEETING <br /> Tuesday, January 6, 1998, 2:00 PM <br /> Room 3040, Lindbergh Terminal <br /> w�O <br /> Chairman Himle called the Planning and Environment Committee meeting to order at 2;00 p.m. <br /> The following were present: <br /> Commissioners: Himle, Gasper, Long, Miller, Reedy, Fiore, Kehler <br /> Staff: N. Finney, J. Hamlet, T.W. Anderson, R.J. Thome, D. Dombrowski, D. <br /> Kautzer, T.L. Anderson, D. Bergsven, R. Vorpahl, G. Warren, R. Kelnz, <br /> W. Burt, D. Probst, R. Tadsen, S. Vecchi, J. Shortreed, G. Schmidt, T. <br /> Howell, P. Ramussen, M. Killian, M. Ryan, J. Unruh <br /> Others: J. Decoster, J. Sayre, NWA; B. Johnson, MASAC; J. Larsen, EQB; J. <br /> Del Calzo, City of Minneapolis; D. Weitzel, City of Richfield; D. <br /> Saunders, SMAAC; F. Benson, FAA-ADO; B. Stemad, SPI; C. Rogers, <br /> CEE; F. Hetman, D. Thomson, Mon-Ray, Inc.; B. Long, City of Mounds <br /> View <br /> Al. FINAL PAYMENTS - MAC CONTRACTS - CF 1153' <br /> The following final payments were submitted for consi•- ation: <br /> a. Regional Airline Aaron <br /> MAC Contract: 106-1-125 <br /> Contractor. McNamara Contracts -, Inc. <br /> Net Contract Amount: $775,1; -.19 <br /> Final Payment: $67,281.91 <br /> This final payment udes Change Order No. 1, an increase of $22,940.14. <br /> The change a • - is the net result of four add items that occurred during the <br /> course of co - ruction. The individual items are as follows: 1) trailer relocation <br /> ($1,231.3 -the contractor was directed to relocate a Signature Flight Support <br /> office iler that was located within the project construction limits; 2) installation <br /> of curity fence bottom rail ($6,249.10) - at the request of MAC police <br /> • partment, the contractor was directed to add a bottom rail to all perimeter <br /> security fence installed under this project; 3) installation of steel posts <br /> ($1,127.32) - the contractor was directed to install steel posts around a new <br /> - . water hydrant to protect it from potential damage from the vehicular traffic; 4) <br /> rock excavation ($14,332.40) -while excavating for electrical conduit and apron • <br /> lighting base installation, the contractor encountered solid bedrock. The <br />