My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1998/05/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1998
>
Agenda Packets - 1998/05/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:55 PM
Creation date
6/18/2018 5:57:27 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
5/11/1998
Supplemental fields
City Council Document Type
City Council Packets
Date
5/11/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11l:r ttr, ".*: 17 ter, i-N 1)13IH1-H H'_;';1_11:_:1PIE ; Zr'rt=t TO 97P4n54P F'.tt1/til <br /> PROJECT MEMORANDUM <br /> Date: May 7, 1998 DUNHAM <br /> ASSOCIATES <br /> To: Mike Ulrich-City of Mounds View <br /> 1 <br /> From: Steve Norberg <br /> CC*15UL7uai. <br /> .:Nca.EERi <br /> PROJECT: Mounds View Community Center <br /> Bel-Rae Ballroom Renovations <br /> Comm. No.: 04-97057.02 <br /> Re: HVAC Concerns <br /> HVAC AS DESIGNED AND PRESENTLY BID <br /> 1. Good economical system. <br /> 2. Electrically heated vestibules-cheaper installation costs with higher energy costs. <br /> • Annual operating costs approximately$3,000/year. <br /> • Maintenance-Electric coil maintenance or replacement every 4 to 5 years. <br /> HVAC DESIGN CHANGE RECOMMENDATIONS <br /> 1. Variable air volume bypass boxes for improved zone control. Costs: $2,000 to$3,000 per added <br /> zone. <br /> 2. Hot water boiler, piping,pumps and controls. <br /> • Better zone controls and allows minimal firing of rooftop units during off hours. <br /> • More efficient energy usage. <br /> • Allows for the usage of hot water heat in vestibules-annual operating costs- $400/year. <br /> • Minimal year maintenance- units will last 15 to 20 years. <br /> 3. Hot water boiler installation costs approximately$100,000. <br /> 4. $2,600 per difference in energy costs per year in vestibule heating only. <br /> SN:mk <br /> \Ut,2ladmwsoocS\PKOJtC7Slo7057.02\ulrieh memosW( <br /> 8200 Normandale Blvd.,Suite 500 • Minneapolis,MN 55437-1060 • (612)820-1400 • FAX(612)820-2760 <br /> :+ TOTAL PI IGE.01 :+;4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.