My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-04-1998 WS
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1998
>
05-04-1998 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:46 PM
Creation date
6/18/2018 6:00:01 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
5/4/1998
Supplemental fields
City Council Document Type
City Council Packets
Date
5/4/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D - <br /> NORTH SUBURBAN I-NET PERFORMANCE STANDARDS <br /> Upon completion of the I-Net upgrade: <br /> Video Transmission <br /> A. Video transmission will comply with the following performance : <br /> standards: <br /> 1. Carrier to noise ratio=45dB or better <br /> 2. Carrier to composite triple beat=53dB or better <br /> 3. Carrier to composite second order=55 dB or better <br /> 4. Carrier to cross modulation=55 dB or better <br /> 5. System signal level variations (peak to valley)=n_ 10 +2 or better <br /> for all coaxial cable portions of the I-Net(where N=the number of <br /> amplifiers in cascade). <br /> B. Testing will occur twice yearly following the timing established in CFR <br /> 76.601 and 76.605. <br /> 1. From the institution to the longest subscriber cascade. <br /> 2. From the institution through the applicable headend/hub site <br /> returning back to the same institution. <br /> 3. Performed using existing I-Net carriers active at the time of the <br /> testing,which will subject them to service interuptions. <br /> 4. Completed at Company-designated entry demarcation point at the <br /> institution. <br /> 5. The system will meet calculated worst case fully loaded video and <br /> audio measurements,taking into consideration existing I-Net data <br /> loading at the time the measurement is taken. <br /> 6. Under ordinary operating conditions. <br /> 2. Digital Transmission <br /> A. For I-Net that is 50% or more coaxial cable,a Bit Error Rate of 1 x 10(-8) at <br /> the demarcation point. <br /> 1. Outage times not included <br /> 2. Ordinary operating conditions <br /> B. For I-Net that is 50% or more fiber optic cable,a Bit Error Rate of 1 x 10(- <br /> 9)at the demarcation point. <br /> 1. Outage times not included <br /> 2. Ordinary operating conditions <br /> C. For both coaxial and fiber network,the company will meet or exceed a <br /> reliability factor of 99.965% on an annual basis. <br /> D. Testing will occur twice yearly,during the months of January/February and <br /> July/August. <br />
The URL can be used to link to this page
Your browser does not support the video tag.