My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-06-1998 WS
MoundsView
>
City Council
>
City Council
>
Packets
>
1990-1999
>
1998
>
07-06-1998 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2018 7:43:21 AM
Creation date
6/18/2018 6:04:03 AM
Metadata
Fields
Template:
MV City Council
City Council Document Type
City Council Packets
Date
7/6/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subd. 1. General Construction: The following procedure and specifications shall be required for <br /> all : • = , -: - • - • • • • driveway construction from streets to private garages, and <br /> parking areas attached thereto:' <br /> a. Excavation: The driveway or parking area shall be excavated to remove all black dirt <br /> from the area to be surfaced. <br /> b. Drainage Provisions: The driveway or parking area shall be constructed so as to <br /> provide drainage from the garage to the street unless a variance is granted by the Building <br /> Inspector2. <br /> of a minimum of four inches (4") of Class 2 crushed rock (3/4" down) compacted in place. <br /> Subd. 32. Concrete Construction: <br /> a. After initial excavation, the driveway shall be backfilled with Class 4 base material, <br /> compacted in place, to an elevation four inches (4") below the finished surface grade of <br /> the driveway. <br /> b. The driveway construction shall consist of a minimum of four inches (4") of three <br /> thousand five hundred (3,500) pound mix, four inch (4") slump with air. <br /> Subd. 43. Asphalt Construction: <br /> a. After initial excavation, the driveway shall be backfilled with Class 4 base material, <br /> compacted in place, to an elevation four inches (4") below the finished surface grade of <br /> the driveway. <br /> b. The driveway construction shall consist of a minimum of two inches (2") (compacted <br /> thickness), Class 5 base material and a minimum of two inches (2") (compacted thickness) <br /> bituminous wearing course conforming to Minnesota Highway Department specifications <br /> 2331. <br /> c. The bituminous wearing course material shall not be delivered to the job site until the <br /> Class 5 base material has been placed compacted. (1988 Code §44.05) <br /> Subd. 4. Brick Construction: <br /> a. After initial excavation and compaction of the exposed earth, the driveway shall be <br /> backfilled with four inches (4') of Class 4 base material.compacted in place. to an <br /> elevation four inches (4') below the finished surface grade of the driveway. <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.