My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1998/07/13
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1998
>
Agenda Packets - 1998/07/13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:59 PM
Creation date
6/18/2018 6:11:09 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/13/1998
Supplemental fields
City Council Document Type
City Council Packets
Date
7/13/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Charges to designated institutions for non-video use of the channels other <br /> than the six (6) non-video dedicated channels (three (3) upstream and three <br /> (3) downstream) on the Institutional Network required in subparagraph a. <br /> above shall be calculated based on Grantee's actual cost plus a 45% margin <br /> or the "most favored comparable user rate", whichever is lower. Charges <br /> to the designated institutions for video or non-video use of the six (6) fibers <br /> provided to the Institutional Network nodes shall be calculated based only <br /> upon Grantee's incremental actual cost for providing the additional six (6) <br /> fibers. <br /> Use of the Institutional Network by a designated institution is limited to its <br /> own use(s) and no institution may sell Institutional Network capacity or <br /> usage to any third party, without the express written consent of Grantee. <br /> 2. Grantee's Use of Capacity. Grantee may use available capacity on the fifty-four <br /> (54) channel Institutional Network required in Paragraph la. above for other uses <br /> including commercial uses, provided, however, that usage of seventy-five percent <br /> (75%) of such capacity by designated institutions shall have priority over other <br /> uses subject to rules or policies adopted by Grantee and approved in advance by <br /> City. Further, should City determine that any portion of Grantee's use of the <br /> twenty-five percent (25%) should be terminated to accomodate the use by a <br /> designated institution for video purposes, City may direct that Grantee terminate <br /> its use at the expiration of any third party use contract or three (3) years, <br /> whichever is sooner. <br /> 3. End-User Equipment. <br /> a. Designated institutions shall be generally responsible for providing their <br /> own end-user equipment. However, Grantee shall provide at no charge <br /> twenty (20) new modulators for City and/or designated institutions use of <br /> the Institutional Network, all as approved by the City. <br /> b. With respect to non-video end-user equipment, upon request by a <br /> designated institution, Grantee must either lease the equipment requested <br /> to the requesting institution or make reasonable efforts to arrange for the <br /> lease of such equipment. Within 30 days of a written request, Grantee <br /> must notify the requesting institution in writing of its ability or inability to <br /> lease the requested equipment and the terms of such lease. The City, its <br /> designee, or the requesting institution may purchase or lease the equipment <br /> from any vendor. <br /> c. In addition, Grantee will provide standby power for the Institutional <br /> Network, provide fifteen (15) new pilot generators, re-tune ten (10) <br /> existing return pilot generators, and re-tune one hundred twenty-four 124 <br /> existing return amplifiers. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.