Laserfiche WebLink
Allowed Uses <br /> The PUD concept plan includes the following uses: <br /> Parcel 1 Gas station/convenience 6,500 sq. ft. max <br /> market <br /> Car wash 3,000 sq. ft. max <br /> RV Dump Station <br /> Parcel 2 Office building 25,000 sq. ft. max <br /> Parcel 3 Office building 5,000 sq. ft. max <br /> Parcel 4 Senior housing 115,800 sq.ft. max <br /> PUD Site Data <br /> Impervious Pervious <br /> Gas station/convenience market/car wash 1.33 ac 0.30 ac <br /> Office building 1.43 ac 0.69 ac <br /> Office building 0.28 ac 0.83 ac <br /> Senior housing 1.31 ac 6.86 ac* <br /> Total 4.22 ac 8.68 ac <br /> (Total Site Area= 13.0 ac) (32.7%) (67.3%) <br /> *This total includes the wetland and St. Paul Waterworks ROW <br /> Dimensional Requirements <br /> Setbacks-Buildings <br /> Highway 10 & Silver Lake Road 30 feet(') <br /> Private drive 15 feet <br /> Interior lot lines 0 feet'2' <br /> Wetland 100 feet(3) <br /> St. Paul Waterworks 30 feet <br /> Setbacks-Parking Areas <br /> Highway 10 10 feet(6) <br /> Silver Lake Road <br /> Parcell 20 feet <br /> Parcel 4 27 feet <br /> Private drive 10 feet(4) <br /> Interior lot lines 0 feet(2) <br /> Wetland 100 feet(3) <br /> St. Paul Waterworks 30 feet <br /> Building Heights(4) <br /> 7. <br />