Laserfiche WebLink
Exhibit"A" <br /> EDGEWOOD DRIVE/HIGHWAY 10-INTERSECTION IMPROVEMENTS <br /> ESTIMA1Jv TOTAL CITY SHARE DEVELOPER <br /> COST SHARE <br /> 1. TRAFFIC SIGNAL 5130,000.00 597.500.00 532.500.00 <br /> 2. TURN LANES TO S120.00.00 $0.00 $120,000.00 <br /> THEATER <br /> 3. PORTION OF THEATER $35.000.00 $0.00 $35,000.00 <br /> ENTRANCE WITHIN ROW <br /> 4. MEDIANrrURNLANES $115.000.00 $115,000.00 $0.00 <br /> TO EDGEWOOD <br /> 5. EDGEWOOD DR. $170,000.00 $170,000.00 $0.00 <br /> RELOCAITON <br /> 6. EDGEWOOD DRIVE $40,000.00 $40.000.00 $0.00 <br /> CUL-DE-SAC <br /> 7. CITY HALL PARKING 520.000.00 $20.000.00 $0.00 <br /> LOT CHANGES <br /> TOTAL $630.000.00 $442,500.00 $187.500.00 <br /> SIR-149487 1 1 <br /> MU210.8 <br /> PSZ-d Zt/Zi'd Oto-1 Ot£81££Z19 N3AYa9 7 Aa3NN3N-W0Jd Wd1t:£0 88-at-day <br />