My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1998/04/06
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1998
>
Agenda Packets - 1998/04/06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:17 PM
Creation date
6/18/2018 7:26:04 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/6/1998
Supplemental fields
City Council Document Type
City Council Packets
Date
4/6/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGIONAL TRAFFIC MODEL <br /> • <br /> Forecast Conditions <br /> In order to develop traffic forecasts for the study area, it was assumed that the TCAAP site and <br /> the Highway 10/96 Triangle would be redeveloped. Input from City staff and a review of the <br /> traffic study completed for the TCAAP site by Short Elliot and Hendrickson, Inc. was considered <br /> in developing anticipated trip generation for the TCAAP and Highway 96/10 sites. The model <br /> assumes a total of 102,000 trips would be generated from the sites daily. During the PM peak <br /> hour, approximately 11,000 trips would be generated from the sites. These trips were distributed <br /> and assigned to the surrounding road network based on the distribution from the Twin Cities <br /> Regional Travel Model. The site-generated traffic was added to the existing ADT counts to <br /> develop the traffic forecasts. Forecasts were developed for three scenarios with each scenario <br /> having different road network access assumptions. The three scenarios are described below. <br /> Future Road Network Overview <br /> In order to adequately model the key intersections in the study area,BRW developed a concept <br /> arterial roadway network which is assumed to be in place at the time of full redevelopment of the <br /> TCAAP site and the Highway 10/96 Triangle. The concept roadway network includes the <br /> "TCAAP Road"within the TCAAP site beginning at Hamline Avenue and running west parallel <br /> to Highway 96 and curving north to parallel Highway 10 and Interstate 35W and terminating at <br /> County Road I. TCAAP Road includes major intersections with Hamline Avenue, Snelling <br /> Avenue (extended to north), County Road H2 (extended to east) and Gateway Boulevard. The <br /> model assumes that Gateway Boulevard would be extended across Highway 96 at the time of <br /> redevelopment of the Highway 10/96 Triangle and would gradually curve northeastward <br /> crossing Highway 10 and intersecting with TCAAP Road. <br /> The Average Daily Traffic on arterial road segments in the study area was calculated for three <br /> future scenarios of varying access. In addition, the function of three main intersections in the <br /> study area was analyzed. The three intersections included are the Highway 10/Gateway <br /> Boulevard intersection, Highway 96/Highway 10 intersection, and the Highway 96/Gateway <br /> Boulevard intersection. For the purposes of the study, all intersections were modeled as at-grade <br /> intersections to determine whether or not they could function in that capacity (unless no access is <br /> assumed). Separated grade interchanges can be assumed to perform more efficiently than the at- <br /> grade intersections. Exhibit 3 illustrates the geometry of the future road network utilized in the <br /> traffic model and provides summaries of ADT volumes anticipated on various segments in the <br /> study area. Tables 1 and 2 summarize turning movements and intersection function for the three <br /> intersections studied in scenarios 1, 2 and 3. <br /> Existing Condition: The 1996 average daily traffic (ADT) for existing arterial roadways in the <br /> study area was input into the model to create a baseline condition. PM Peak Hour turning <br /> movements were also input for three key intersections. The level of service at the three existing <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.