My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1998/04/06
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1998
>
Agenda Packets - 1998/04/06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:17 PM
Creation date
6/18/2018 7:26:04 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/6/1998
Supplemental fields
City Council Document Type
City Council Packets
Date
4/6/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i Project Budget Costs <br /> Budget level construction costs have been estimated in order to provide a relative comparison <br /> between each of the four layouts described in the report. The estimated costs only address major <br /> project items such as signal systems, turn lane construction,roadway/frontage road extensions, <br /> access ramps,retaining walls. Costs for the through lane construction of Highway 96 have not <br /> been included since they would be the same in all layouts. Costs for other standard items <br /> including lighting, storm drainage and traffic control have not been included for the same reason <br /> as the mainline. The costs associated with bridge construction on Highway 10 would be nearly <br /> identical for layouts#2, #3, and#4 and have not been included in the comparison. <br /> The following is a summary of comparison costs for each of the four layouts. Further <br /> breakdowns of the costs are included in the appendix. <br /> Layout#1: At-Grade Intersection <br /> Estimated Budget Comparison Cost $710,000.00 <br /> Layout#2: Grade Separated Interchange,North Access <br /> Estimated Budget Comparison Cost $747,250.00 <br /> • Layout#3: Grade Separated Interchange,North and South Access <br /> Estimated Budget Comparison Cost $1,498,500.00 <br /> Layout#4: Grade Separated Interchange,No Access <br /> Estimated Budget Comparison Cost $305,000.00 <br /> 11, <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.