Laserfiche WebLink
i Project Budget Costs <br /> Budget level construction costs have been estimated in order to provide a relative comparison <br /> between each of the four layouts described in the report. The estimated costs only address major <br /> project items such as signal systems, turn lane construction,roadway/frontage road extensions, <br /> access ramps,retaining walls. Costs for the through lane construction of Highway 96 have not <br /> been included since they would be the same in all layouts. Costs for other standard items <br /> including lighting, storm drainage and traffic control have not been included for the same reason <br /> as the mainline. The costs associated with bridge construction on Highway 10 would be nearly <br /> identical for layouts#2, #3, and#4 and have not been included in the comparison. <br /> The following is a summary of comparison costs for each of the four layouts. Further <br /> breakdowns of the costs are included in the appendix. <br /> Layout#1: At-Grade Intersection <br /> Estimated Budget Comparison Cost $710,000.00 <br /> Layout#2: Grade Separated Interchange,North Access <br /> Estimated Budget Comparison Cost $747,250.00 <br /> • Layout#3: Grade Separated Interchange,North and South Access <br /> Estimated Budget Comparison Cost $1,498,500.00 <br /> Layout#4: Grade Separated Interchange,No Access <br /> Estimated Budget Comparison Cost $305,000.00 <br /> 11, <br /> 16 <br />