My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1996/10/29
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1996
>
Agenda Packets - 1996/10/29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:47 PM
Creation date
6/18/2018 11:17:51 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/29/1996
Supplemental fields
City Council Document Type
City Council Packets
Date
10/29/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> A:sal0 AlIMF MEMORANDUM <br /> ❑ ST.PAUL,MN ❑ MINNEAPOLIS,MN U ST.CLOUD,MN ❑ CHIPPEWA FALLS,WI ❑ MADISON,WI <br /> TO: Pam Sheldon, Community Development Coordinator <br /> City of Mounds View <br /> FROM: Rocky Keehn <br /> DATE: August 23, 1996 <br /> RE: Mounds View, Minnesota <br /> Review of New Apostolic Church <br /> SEH No. A-MOUND9701.00 <br /> We have completed a review of the plans submitted to me dated August 15, 1996. The site does <br /> . provide storm water treatment prior to discharging into Spring Creek through grass swales and grass <br /> pond areas. This should mitigate for construction in the 100-foot wetland buffer area. <br /> Since the site will not have large amounts of cars on a daily basis, the grass treatment areas will <br /> provide enough water quality treatment. Also, the area which would have most of the cars parked <br /> on a daily basis drains to the larger grass area which would further improve the quality of runoff <br /> from the site. <br /> Our only recommendation on the grass ponding areas is that they not be sodded. A sandy topsoil <br /> should be placed and a rye grass seed used. This will provide better infiltration into the soil for the <br /> runoff. <br /> Rate of runoff should not be a problem, since the area drains over the grass area prior to discharging <br /> to the street. Our only concern is that the house just to the east of the site has a driveway that slopes <br /> towards the house. The only way to keep water in the street is a raised curb in front of the driveway. <br /> If the church discharges additional water to the street, it may overtop the curb and drain towards the <br /> house. The developer should investigate whether or not this will occur. <br /> If you have any question, please call me at 490-2026. <br /> tlo <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.