My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1996/11/06
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1996
>
Agenda Packets - 1996/11/06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:55 PM
Creation date
6/18/2018 11:28:13 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/6/1996
Supplemental fields
City Council Document Type
City Council Packets
Date
11/6/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
:MI OF REQUEST FOR COUNCIL CONSIDERATION Agenda Section <br /> STAFF REPORT <br /> C)UWGt <br /> 1Report Number: <br /> • WORKSESSION MEETING DATE <br /> " IIL �'Wl July 8, 1996 Report Date: 7/8/96 <br /> sA <br /> rOdd.fs-Partnets‘4' <br /> Item Description: Consideration of Bids for the Reconstruction of Bronson Drive <br /> Administrator's Review/Recommendation: <br /> -No Comments to supplement this report <br /> -Comments attached. X <br /> Explanation/Summary(attach supplement sheets as necessary) <br /> Summary: <br /> The bid opening for the reconstruction of Bronson Drive was held today at 11:00 am. A total of five <br /> contractors submitted bids. There were three alternates included in the plan. As you might recall the first <br /> alternate was to install pipe in the ditch from Belle Lane to the surface water pond behind Pinewood <br /> Elementary School instead of clearing and reshaping the ditch. The other two alternates were for the <br /> utilization of plastic pipe for the storm sewer through part of the project, or the entire project. Staff is <br /> recommending that plastic pipe be installed throughout the entire project, and that the pipe also be installed <br /> verses merely clearing and regrading the existing ditch. The Rice Creek Watershed District is still reviewing <br /> the plans, but staff does not anticipate and complications resulting from their review. <br /> A summary of the bid tab accompany's this report. <br /> Staff recommends award of the contract to include the base bid and alternate 2 & 3 to the low bidder, Forest <br /> Lake Contracting for the sum of$578,529.68. The total project cost is estimated to be $759,320.21, which <br /> includes construction contingency, construction engineering, administration expenses. A unit price for <br /> equipment cost was also requested to perform an undetermined amount of pond cleaning in the surface water <br /> pond north of Bronson Drive. <br /> ,i, --;' . <br /> Michael Ulrich, Director of Public Works <br /> RECOMMENDATION: <br /> Staff recommends award of the contract to include the base bid and alternate 2 & 3 to the low bidder, Forest <br /> Lake Contracting for the sum of$578,529.68. The total project cost is estimated to be $759,320.21, which <br /> includes construction contingency, construction engineering, administration expenses and to authorizes the <br /> Public Works Director to sign all change orders up to five percent (5%) of the total project costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.