My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1996/09/09
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1990-1999
>
1996
>
Agenda Packets - 1996/09/09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:56 PM
Creation date
6/18/2018 2:42:24 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
9/9/1996
Supplemental fields
City Council Document Type
City Council Packets
Date
9/9/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CRTI OF REQUEST FOR COUNCIL CONSIDERATION Agenda Section <br /> STAFF REPORT Report Number: <br /> • <br /> (��llJGG{r 9Report Date: 9/9/96 <br /> CITY COUNCIL MEETING DATE <br /> �" ][ i�1 September 9. 1996 Special Order <br /> �p'' ,QS Consent Aaendaof Bus. <br /> o��°sf'Partnersb o <br /> Public Hearings <br /> X Council Business <br /> Item Description: Pedestrian Bridge Surface Water Pond <br /> Administrator's Review/Recommendation: <br /> -No Comments to supplement this report X <br /> -Comments attached. <br /> Explanation/Summary(attach supplement sheets as necessary) <br /> Summary: <br /> Staff spoke with Aris from BRW Inc. to request reviewal of the proposals submitted by SEH for the removal <br /> of the surface water pond adjacent to the Bridgeman's property. Of the first two options available, Aris <br /> preferred option two as this would allow an additional 1.5 to 2 feet of fill to the pond. Aris further suggested <br /> that approximately an additional $3,000 be added to the design to allow for some type of decorative rocks to <br /> placed around the stand pipes. This would enhance the aesthetics of the pond. <br /> At this point, staff would request authorization to negotiate design and construction engineering and <br /> management of the project with either SEH or BRW. Staff is in the process of scheduling a meeting with the <br /> o firms to discuss the best method of handling this part of the bridge project. Staff will seek Council's <br /> proval of the additional project upon the completion of the discussions with both firms. <br /> K---'\ _ <br /> _>/e/::;- 7/Je"'--VX <br /> Michael Ulrich, Director of Public Works <br /> RECOMMENDATION: <br /> Authorize staff to negotiate services for design, construction engineering and management to implement <br /> option no. 2 for the removal of the surface water pond adjacent to the Bridgeman's property and present the <br /> ntract to Council for consideration. <br /> o . <br />
The URL can be used to link to this page
Your browser does not support the video tag.