Laserfiche WebLink
• <br /> D. Water Permit Surcharge - $.50 <br /> E. Sewer Permit Surcharge - $.50 <br /> 91. Plan Check Fee -when a plan is required to be submitted by Subsection(C) of Section <br /> 301 of the Uniform Building Code, except for residential garages, storage buildings, <br /> decks and additions costing less than$10,000 a plan review fee equal to 65% of the <br /> building permit fee shall be paid. When plans are incomplete or changed so as.to require <br /> additional plan checking, an additional fee shall be paid based upon Table 3A of the <br /> Uniform Building Code. <br /> 92. Insufficient Funds (NSF) check- $20 <br /> 93. Tax - 6.5%, maps, copies. <br /> 94. Water Hydrant Deposit- $300 <br /> A. Water used from hydrant- $1.30/1,000 gallons <br /> B. Meter Deposit, 2- %2" - $500 <br /> C. 5/8" Meter Deposit - $85 <br /> D. Wrench Deposit- $20 <br /> E. Hose Deposit- $20 <br /> F. Adapters - $20 deposit <br /> 95. Tree Removal - See City Forester <br /> 96. Planning Sign Deposit- $50 per sign <br /> 97. Park Dedication Fee <br /> Residential: <br /> 0.0 -2.0 Dwelling units/acre $100/acre <br /> 2.1-3.0 Dwelling units/acre $150/acre <br /> 3.1-4.1 Dwelling units/acre $200/acre <br /> 4.1-5.0 Dwelling units/acre $250/acre <br /> Over 5.0 Dwelling units/acre 10% of land subdivision <br /> Commercial/industrial 10% of land subdivision <br /> i <br /> 1996 Fee Schedule Page 14 <br />