Laserfiche WebLink
• <br /> EVEREST CONSTRUCTION <br /> comp <br /> , y_tRE i)F THE F' )('I'L(1) <br /> May 17, 1996 <br /> SCHEDULE C <br /> MOUNDS VIEW BUSINESS PARK <br /> BUILDING N SITE AND PUBLIC IMPROVEMENTS <br /> ITEM $ <br /> 1. Clearing, Excavation, Erosion Control $75,000.00 <br /> 2. Ponding with Clay Liner 10,000.00 <br /> 3. Retaining Walls 0 70,000.00 <br /> 4. Soil Corrections 50,000.00 <br /> 5. Watermains and Hydrants 55,000.00 <br /> 6. Sanitary Sewers 15,000.00 <br /> • 7. Storm Sewer System 55,000.00 <br /> 8. Driveway Aprons and Curbing 12,000.00 <br /> 9. Paving Base 56,000.00 <br /> 10. Street Lighting 7,000.00 <br /> 11. Landscaping 45,000.00 <br /> 12. Irrigation 20,000.00 <br /> 13. Program Avenue (paving and curb) 25,000.00 <br /> 14. Soil Reports/Surveys 6,000.00 <br /> 15. Architectural/Engineering Fees 10,000.00 <br /> 16. Soils Testing/Location Surveys 10,000.00 <br /> 17. Permits 10,000.00 <br /> 18. Supervision, General Conditions 20,000.00 7 <br /> 110 19. Overhead and Fee39,000.00 4S-(0 <br /> ( <br /> TOTAL $590,000.00 <br />