Laserfiche WebLink
• I am going to use this opportunity to extend several "Thank you's." First, a sincere"Thank <br /> you"to the Council members for showing great confidence in me by appointing me to the <br /> position of Interim Finance Coordinator. I enjoyed the challenge of the position and hope I <br /> will be able to take what I have learned and contribute more in my duties here with the <br /> city. Second,thanks to the Department Heads who worked with me and encouraged me. I <br /> have a much better understanding and appreciation of the many facets of their job. Third, <br /> sincere thanks to City Staff. Everyone, from every department, was wonderful,patient, <br /> and supportive to me. Finally, I am hard pressed to express in mere words my"thank <br /> you"to Kitty and Dorothy for their support and strength. They have worked up to 12 hour <br /> days and come in some weekends in an attempt to keep up with the work load generated <br /> by their additional duties. They have never done.anything but their very best. I was <br /> confident that with everyone's help the three of us,together, could handle the job. YOU <br /> ALL came together and made the past eight months work. THANK YOU. <br /> Mary T. <br /> PUBLIC WORKS <br /> • The streets dept. has been patching streets in preparation for slurry sealing in the upcoming <br /> weeks. Several manufactures have left demonstrator rollers for us to use during the past <br /> two weeks. This has provided some very helpful analysis of the different machines, their <br /> capabilities and specifications. Staff is proposing to replace the City's current roller in <br /> 1997. Cracksealing equipment has also been demonstrated in the previous weeks in <br /> preparation of a 1997 purchase. <br /> • Final inspections were performed on sanitary sewer main at the Sherwood Estates <br /> development this week. <br /> • Construction of the public utilities began last week for Larry Beach's twin homes on Silver <br /> Lake Road. Some complications developed and as a result, on July 1, 1996 a Stop Work <br /> Order was issued. Until several items are corrected or addressed, no further work will be <br /> allowed on the project. <br /> • Mark has been working on the spray bar assembly for the liquid calcium chloride tank for <br /> the past couple of weeks. It is nearing completion, and is very well constructed. - <br /> • The second automatic meter reading started this week. After the phone reads are complete, <br /> staff will change the SSI (programmer/radio reader)to radio and the radio reads will be <br /> performed by staff. It is anticipated that a few of the installations will not call in and we <br /> will have to be reinspect them. <br />