Laserfiche WebLink
• • Expand"Festival" parade celebration with revitalized joint participation of business, <br /> organizations, groups and residents. <br /> • On-going. <br /> • Initiate the development of design standards in coordination with re/development <br /> activities. <br /> • Contained in 1996 EDC Work Plan. <br /> HIGHWAY 10 REDEVELOPMENT <br /> • Develop Highway 10 Redevelopment Plan per Economic Development Commission <br /> recommendations and Economic Development Authority directive. <br /> • Draft report prepared-continue to prioritize in 1996. <br /> • Utilize technical experts as on-going resource to effectively <br /> coordinate key elements of the plan. <br /> • Examine infrastructure compatibility with proposed plan and <br /> determine cost associated with design concepts. <br /> • Develop a proactive model for initiating and coordinating discussions and activities at all <br /> levels of government and private sector groups regarding the redevelopment of the <br /> Highway 10 corridor. <br /> • 1996-Discuss with Spring Lake park and Arden Hills. <br /> • Complete inventory of Highway 10 non-conforming uses. <br /> • Completed- update in 1996. <br /> • Begin to integrate land use data on Geographic Information System. <br /> • Pursue in 1996. <br /> • Play an active role in the development of Highway 610 and the turnback of Highway 10. <br /> ♦ On-going through North Metro Mayors Association. <br /> • Coordinate Comprehensive Plan revisions to establish consistent and compatible land uses. <br /> • Continue through 1996. <br /> HOUSING REHABILITATION <br /> • Using housing data, develop Housing Inspection and Rehabilitation Program. <br /> • Complete <br /> I <br /> • <br />