My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-25-2016 CC
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2016
>
07-25-2016 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:11 PM
Creation date
6/19/2018 11:36:26 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/25/2016
Supplemental fields
City Council Document Type
City Council Packets
Date
7/25/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No: 7A <br />Meeting Date: July 25, 2016 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report To: Honorable Mayor and City Council <br />From: Brian L. Erickson, Public Works Director/City Engineer <br />Item Title/Subject: Resolution 8611, Municipal Consent for MnDOT I35W North Project <br /> <br />Background: <br />MnDOT is currently designing improvements for I-35W between Trunk Highway 36 (Roseville) <br />and Sunset Avenue (Lino Lakes), see attachment 1. The proposed improvements would include <br />adding a managed (MnPASS) lane in each direction to improve capacity and reduce congestion. <br />The project would potentially include modification or replacement of existing I-35W pavement and <br />bridges as well as the installation of noise walls at various locations along the corridor. Although <br />the project is not fully funded at this time MnDOT is moving forward with the final design and <br />environmental impact assessments so that the project can be implemented as funding becomes <br />available. <br /> <br />MN Statute 161.16 requires Municipal Consent for MnDOT improvements of this type. The <br />process begins with a Public Hearing concerning the final layout. Following the Hearing the City <br />Council has an additional 90 days to consider the final layout for approval. Should the Council <br />not act in that timeframe the layout is deemed as approved (per MN Statute 161.164). <br /> <br />Discussion: <br />The Notice of Public Hearing (attachment 2) was published in the Sun Focus on June 24, 2016. <br />This notice is a required part of the Municipal Consent process. Since the publication of this <br />notice MnDOT staff discovered a scheduling conflict and requested that the City reschedule the <br />Municipal Consent Public Hearing to a mutually agreeable date (attachment 3). The MnDOT staff <br />is available for the Council meeting on August 22, 2016 and will be here to discuss the project <br />with the Council and public at that time. <br /> <br />As part of this project MnDOT is anticipating the potential for reconstructing or adding noise walls <br />along I35W and US Highway 10. MnDOT, City staff, and property owner representatives <br />reviewed the location of the sound wall along US Highway 10 to establish possible right of way <br />obstructions in Colonial Village. During that walk through there were some minor obstructions, <br />but they can be corrected without significant effort. <br /> <br />Recommendation: <br />Staff recommends that the City Council open the Public Hearing for Municipal Consent and then <br />continue the hearing to the August 22, 2016 meeting so that MnDOT staff can be present to <br />address questions of the public and City Council. <br /> <br />Respectfully submitted, <br /> <br /> <br />Brian L. Erickson, P.E. – Public Works Director/City Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.