Laserfiche WebLink
Item No: 7I <br />Meeting Date: August 8, 2016 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: Brian Erickson, Public Works Director/City Engineer <br />Item Title/Subject: Resolution 8614, Approve Replacement of Driveway and Sidewalk <br />at 3009 County Road H <br />Introduction: <br />As part of City Project 2003-001, sidewalk was installed along the north side of County Road H from <br />the Fridley city limits east to Silver Lake Road. This project was completed in late 2003. In addition <br />to the sidewalk that was constructed a hand rail and guard rail was installed to the east of 3009 <br />County Road H. <br /> <br />Discussion: <br />The resident, Mr. Steve Borden at 3009 County Road H, notified the Public Works staff of a <br />problem that has occurred as part of this sidewalk construction project. Elevations were taken at <br />various points along Mr. Borden’s driveway and the sidewalk on either side. This showed that <br />both the sidewalk and driveway apron drain back toward his private property. As a result Mr. <br />Borden has experienced a significant amount of street drainage across his property to Spring <br />Creek. This has resulted in some erosion as well causing a general nuisance. <br /> <br />In order to correct this situation it’s necessary to have the sidewalk as well as a portion of the <br />driveway reconstructed and graded properly. To accomplish this work, staff sought quotes from <br />five concrete contractors. Ultimately, two quotes were received. The table below details these <br />quotes: <br /> <br />Funding for this work would come from the Street Improvement Fund (485-4470-7050). <br /> <br />Recommendation: <br />Staff recommends that City Council award this project to Paragon Paving in order to correct the <br />drainage problem that exists for the property owner at 3009 County Road H. In addition, staff <br />recommends a contingency of 5% ($550.00) for unforeseen conditions be approved. Funding for <br />this work would be from the Street Improvement Fund (485-4470-7050). <br /> <br />Respectfully Submitted, <br /> <br /> <br /> <br />Brian L. Erickson, P.E. <br />Director of Public Works/City Engineer <br /> <br />Company Quote <br />Paragon Paving 10,971.00$ <br />Neeck Construction, Inc.11,750.00$ <br />LaMere Concrete, Inc.No quote <br />Kelleher Construction No quote <br />D & S Concrete and Masonry No quote <br />Concrete Repairs