Laserfiche WebLink
<br /> <br />• Repair and replace common area floor tiles, work to be performed by RAK <br />Construction, Inc. of East Bethel, MN. <br />Estimated cost $3,679.41 <br /> <br />• Replace ceiling tiles in Cedar Conference Room, work to be performed by <br />Acoustical Concepts, Inc. of Shakopee, MN. <br /> Estimated cost $2,495. <br /> <br />• Install electronic door lock on main office door, work to be performed by Pro-Tec <br />Design of Minneapolis, MN. <br /> Estimated cost $1,796.39. <br /> <br /> <br />• Install room name signs throughout the building signs to be purchased from MN <br />State Industries of Moose Lake, MN. Room name signs to be installed by Public <br />Works Staff. <br /> Estimated cost $2,500.00 <br /> <br /> <br /> <br />Recommendation: <br />Staff recommends the City Council approve the quotes to perform the building <br />maintenance needs and building alterations as listed from the various vendors and <br />contractors at the Community Center at a cost of $39,766.63, and use the funds from <br />account 480-4180-7050 which includes $40,000.00 for expansion and remodel of the <br />exercise room. Staff also recommends a 5% contingency of $1,988.33 for any <br />unforeseen issues that may arise to be funded from account 252-4350-5130, Repairs <br />Equipment, for a total estimated project cost of $41,754.96. <br /> <br /> <br />Respectfully submitted, <br /> <br /> <br />Don Peterson <br />Public Works Supervisor <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />