Laserfiche WebLink
<br />2017 Fee Schedule Page 6 of 21 <br />Fences/Kennels <br />Seven feet and below <br />Above seven feet <br />$30 per installation (no surcharge) <br />$40 per installation (plus $1.00 surcharge) <br /> <br />Fire Permits <br />Fire (All Fire permits unless noted <br />otherwise) <br />Fire Works Display <br />Fireworks Sales <br /> <br /> <br />Temporary Tent <br />Tank Installation (fuel, oil, gas, etc.) <br />Tank Removal (fuel, oil, gas, etc.) <br />Operational Permits <br />$100 <br /> <br />$100 <br />$350 (business selling only fireworks) <br />$100 (business selling fireworks & other <br />retail) <br />$50 <br />$100 per tank (no surcharge) <br />$50 per tank (no surcharge) <br />$50 (annually) <br />Fireplaces <br />Wood/Corn burning Stove (Building Permit) <br />Gas Fireplace <br />$30 plus $1.00 surcharge <br />See Mechanical <br />Insulation $30 plus $1.00 surcharge <br />Manufactured Homes (See Chapter 1110) <br />Installation Permit Use valuation table <br />Mechanical (Gas hook up) $25 (plus $5.00 surcharge) <br />Installation Escrow $500 per permit <br />Mechanical (Heating, Ventilation, Air Conditioning & Gas) <br />Residential: <br />Air Conditioning <br />Furnace <br />Air Exchanger <br />Sheet Metal/Duct Work <br />Ventilation Systems <br />Gas Fireplace <br />Gas/Oil Piping <br />Steam, Hot Water Heating <br /> <br />$35 per unit <br />$35 per unit replacement, $45 per unit new <br />$35 per unit <br />$35 <br />$20 for first fan plus $5 for each add’l fan <br />$40 (includes incidental piping) <br />$35 per unit <br />$40 per unit <br />Commercial Use valuation table plus surcharge of .0005 <br />of contract price) <br />Irrigation System (Back Flow Preventer) See Plumbing Fees <br />Moving Buildings (See Chapter 1007) <br />Principal Structure $175 per building (plus $1.00 surcharge) <br />Accessory Structure (larger than 400sq. ft.) $50 per building (plus $1.00 surcharge) <br />Accessory Structure (400 sq. ft. or less) $30