Laserfiche WebLink
<br /> <br />ESP Report <br />January 12, 2015 <br />Page 2 <br /> <br /> <br />Currently the following items are being proposed to be replaced with this Energy Savings <br />Partnership. <br />• Community Center Interior lighting retrofit and upgrades (LED) <br />• Community center exterior lighting retrofit and upgrades <br />• Replace RTU #3,#5, #6 and #7 & kitchen MUA with BAS upgrades <br />• City Hall HVAC controls <br />• City Hall Lighting to T-8 <br />• City Hall boiler / hot water heater upgrades <br />• Park buildings Random, Lambert and Silver View install solar panels 20KW <br />system <br />• Trail Lights upgrade to LED <br /> <br />Recommendation: <br />Staff recommends the City Council approve resolution 8366 approving an agreement between <br />the City of Mounds View and Trane Building Services for an Energy Savings Partnership <br />administered by the St. Paul Port Authority. The Program includes replacement of RTU #3, 5, 6, <br />and 7, upgrading the controls for the units; replace the kitchen make up air unit. Upgrading <br />lighting on the interior and exterior to LED bulbs and controls as needed. Upgrading the HVAC <br />controls at City Hall, installing LED bulbs at and Energy efficient t-8 were applicable. Retrofitting <br />all trail lights along County Road 10 to LED style. Installing two (2) 40Kw solar panel units one <br />at City Hall the other at the Community Center. The program will be paid for with the energy <br />savings and energy use. Total cost of the project is $577,959.00. All equipment and supplies will <br />be purchased under TCPN number 32-10012-15-001. <br /> <br /> <br />Respectfully submitted, <br /> <br /> <br />Don Peterson <br />Interim Public Works Director <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />