My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-26-2015 CC
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2015
>
01-26-2015 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:07 PM
Creation date
6/19/2018 12:35:46 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
1/26/2015
Supplemental fields
City Council Document Type
City Council Packets
Date
1/26/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Ground mounted SES shall be screened from view to the extent <br />possible without reducing their efficiency. Screening may include <br />walls, fences or landscaping. <br /> <br />c. Notification. Prior to the installation of a SES, the operator must provide <br />evidence showing their regular electrical service provider has been informed <br />of the customer’s intent to install an interconnected, customer-owned SES. <br />Off-grid systems shall be exempt from this requirement. <br /> <br />d. Feeder lines. Any lines accompanying a SES, other than those attached to <br />on-site structures by leads, shall be buried within the interior of the subject <br />parcel, unless there are existing lines in the area which the lines <br />accompanying an SES can be attached. <br /> <br />e. Commercial. All SES shall be limited to the purpose of on-site energy <br />production, except that any additional energy produced above the total onsite <br />demand may be sold to the operator’s regular electrical service provider in <br />accordance with any agreement provided by the same or applicable <br />legislation. <br /> <br />f. Restrictions on SES Limited. No homeowners’ agreement, covenant, <br />common interest community, or other contract between multiple property <br />owners within a subdivision of Mounds View shall restrict or limit solar <br />systems to a great extent that Mounds View’s renewable energy ordinance. <br /> <br />g. Mounds View encourages solar access to be protected in all new subdivisions <br />and allows for existing solar to be protected consistent with Minnesota <br />Statutes. Any solar easements filed, must be consistent with Minnesota <br />Statutes, Chapter 500, Section 30. <br /> <br />Subd. 3. Abandonment: A SES that is allowed to remain in a nonfunctional or <br />inoperative state for a period of twelve (12) consecutive months, and which is not <br />brought in operation within the time specified by the City, shall be presumed <br />abandoned and may be declared a public nuisance subject to removal at the <br />expense of the operator. <br /> <br /> <br />1128.04: GEOTHERMAL ENERGY SOURCES AND SYSTEMS <br /> <br />Subd. 1. Districts: Ground source heat pump systems (GSHPS) shall be allowed as an <br />accessory use in all zoning districts. <br /> <br />Subd. 2. General Standards: <br /> <br />a. All components of GSHPS including pumps, borings and loops shall be <br />setback at least five (5) feet from all lot lines. <br /> <br />b. Easements. All components of GSHPS shall not encroach on easements. <br /> <br />c. GSHPS are prohibited in surface waters and wetlands. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.