My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-23-2015 CC
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2015
>
02-23-2015 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:33 PM
Creation date
6/19/2018 4:33:05 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/23/2015
Supplemental fields
City Council Document Type
City Council Packets
Date
2/23/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No: 7E <br />Meeting Date: February 23, 2015 <br />Type of Business: Council Business <br />Administrator Review: ____ <br /> <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: Brandon Stenglein, Public Works Project Coordinator <br />Item Title/Subject: Resolution 8381, Approving the Bidding Documents and Authorizing <br />the Advertisement of Bids for the 2015 Seal Coat Project for areas A, <br />B, & C <br />Background: <br />The City is in the process of reconstructing 26 miles of City-owned streets as part of the Streets <br />and Utilities Improvement Program (Program). The City established a pavement maintenance plan <br />for these streets, and Areas A, B, and C are scheduled for a bituminous seat coat. <br /> <br />The areas to be seal coated are project areas A, B, & C (see attached Program map). These <br />areas contain 9.1 total miles of streets and are located in various parts of the city. Area A was <br />reconstructed in 2009, and Areas B & C were reconstructed in 2010. Other than crack filling, there <br />has been no major maintenance work performed on these streets since their reconstruction took <br />place, and to ensure the longevity and performance of these roads, a bituminous seal coat is <br />recommended. <br /> <br />Discussion: <br />Public Works engineering staff has prepared preliminary design plans, and specifications in house <br />for the 2015 Seal Coat Project. <br /> <br />Construction Estimate <br />Public Works engineering staff has put together estimated construction costs for the seal coat <br />project of, $270,000. The estimated cost is based upon a defined scope of work and schedule to <br />accommodate construction in 2015. Plans and Specifications for this project will follow Mn/DOT <br />standards. <br /> <br />The 2015 budget includes funding of $350,000 to perform the proposed seal coat work in the <br />Street Improvement Fund (485-4470-7050). <br /> <br />Proposed Project Schedule <br />The project requires a public bid process since the total construction costs are expected to exceed <br />$100,000. The advertisement for bid will need to be posted 21-days in advance of the bid opening. All <br />qualified seal coat contractors are invited to be. The following is a proposed schedule based upon a <br />public bid process: <br /> <br />February 23 City Council approves Bid Doc./Authorizes Ad for Bid <br />March 16 Advertisement for Bid posted <br />March 30 Pre-Bid meeting with potential bidders <br />April 7 Bid Opening <br />April 13 City Council awards construction contract <br />June 20-27 Construction begins <br />Late July Construction complete <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.