My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2015/06/22
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2015
>
Agenda Packets - 2015/06/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:35 PM
Creation date
6/19/2018 4:56:18 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/22/2015
Supplemental fields
City Council Document Type
City Council Packets
Date
6/22/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No: 07D <br />Meeting Date: June 22, 2015 <br />Type of Business: CB <br />City Administrator Review: _____ <br />City of Mounds View Staff Report <br />To: Honorable Mayor and City Council <br />From: Brian Erickson, P.E., Director of Public Works/City <br />Engineer <br />Item Title/Subject: Resolution 8431, Approving an Engineering Services <br />Agreement with Braun Intertec for Construction Materials <br />Testing and Special Inspection Services Related to <br />Mustang Drive <br /> <br />Introduction: <br />The City Council is asked to approve an engineering services agreement with Braun Intertec for <br />construction materials testing and special inspection services related to Mustang Drive and <br />Mustang Circle. <br /> <br />Discussion: <br />The construction contract for Mustang Drive and Mustang Circle Pavement Rehabilitation and <br />Drainage Improvements (Project # 2014-C01) was awarded at the June 8, 2014 Council <br />meeting. However, one additional and necessary element to insure the success of this project is <br />the material testing services required during construction. As a result fee proposals were <br />solicited from two firms for these services. Braun Intertec’s proposal was the lowest priced at <br />$5,237 for the soil, concrete and bituminous testing. These services are customary for street <br />and utility construction. Public Works recommends adding a 15% or $785 contingency to the <br />total fee proposal in the event additional quality assurance testing is required. It should be noted <br />that this proposal is based on estimated hours and reimbursable expenses, and as a result the <br />final cost could be higher or lower than this estimate. <br /> <br />Recommendation: <br />Staff recommends the City Council adopt the attached resolution authorizing the approval of an <br />engineering services agreement with Braun Intertec for construction materials testing and special <br />inspection services for the Mustang Drive and Mustang Circle Pavement Rehabilitation and <br />Drainage Improvement project (2014-C01). <br /> <br /> <br />Respectfully submitted, <br /> <br /> <br /> <br />_______________________ <br />Brian Erickson <br />Director of Public Works/City Engineer
The URL can be used to link to this page
Your browser does not support the video tag.