<br /> <br /> <br />Item 07D <br />February 9, 2015, City Council Meeting <br />Page 2 <br /> <br /> <br />Storm Drainage: <br />Street flooding at the intersection of Mustang Drive and Mustang Circle occurs on a <br />frequent basis. This intersection is the low point on Mustang Drive and is the only <br />location where drain inlets exist. An area of approximately 16.7 acres of the industrial <br />park drains to these intersection inlets. Actual flooding is caused by the existing storm <br />sewer system being unable to accommodate runoff from storm events as frequent as <br />every one year. Flooding from these frequent storms cause shallow ponding in the <br />street and the grass boulevard areas, larger storm events cause street ponding to a <br />depth of about one foot that extends 70 feet to the north of the intersection. A significant <br />contributor to this runoff is associated with the freight distribution property on the <br />Southside of Mustang Drive. <br /> <br />A drainage study was prepared in 2007 by Stantec (formerly Bonestroo) for Mustang <br />Drive/Circle intersection. The study detailed the drainage issues and inadequacies, and <br />also provided four options for improving flooding at this intersection. These options <br />involve one or more improvements involving street grades, drain inlet and storm sewer <br />modifications, and new storm ponds. Public Works is recommending an option where <br />the existing street profile would be modified to direct excess runoff north along Mustang <br />Circle, requiring reconstruction of the road profile to remove the high point located 70 <br />feet north of the intersection. This will also require modifications to two existing entrance <br />drives to match the revised curb line elevations. This option will direct excess flow to the <br />existing low point in Mustang Circle. The existing drainage channel (ditch) west of the <br />street may also need to be re-graded to provide adequate capacity <br /> <br />Funding: <br />Improvements costs for Mustang Drive/Mustang Circle are being proposed to be <br />assessed in accordance with Chapter 202 of the Municipal Code. <br /> <br />Recommendation: <br />Staff recommends the City Council accept and approve the Feasibility Report from <br />Stantec as reviewed at the February 2, 2015 Council Work Session, and set a Public <br />Hearing for February 23, 2015 at 7:05pm for Mustang Drive/Mustang Circle Pavement <br />Rehabilitation and Drainage Improvements with the estimated total project cost of <br />$610,000.00. <br /> <br />Respectfully submitted, <br /> <br /> <br />Don Peterson <br />Interim Director of Public Works <br /> <br />