My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2015/11/09
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2015
>
Agenda Packets - 2015/11/09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:01 PM
Creation date
6/19/2018 5:21:14 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/9/2015
Supplemental fields
City Council Document Type
City Council Packets
Date
11/9/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 3 <br />locations which are fairly close to each other. One crossing is near the traffic signal and the second <br />crossing is about 50’ southwest of the signal. The crossing located away from the signal is proposed to <br />be eliminated for the following reasons: <br />·The crossing is located an odd distance away from the intersection and in an unusual location <br />for a typical mid-block crossing <br />·There is no striped crosswalk or signing notifying motorists of the crossing <br />·There is another crossing located 50’ away at the signal which is the typical crossing location <br />COST ESTIMATE <br />A detailed cost estimate has been prepared and is attached to this memo. Ramsey County has a cost <br />participating policy where they will generally participate in the costs for sidewalks and trails constructed <br />within the County right-of-way. The policy states the County may share in 50% of the costs for the <br />surface and base materials for sidewalks and trails. This would include participation in the class 5 <br />aggregate base and bituminous pavement costs of the trail. Therefore, the costs for the trail segments <br />can be summarized as follows: <br />Summary of Project Costs and Funding <br />Total Costs County Share City Share <br />Segment 6 $ 126,400 $ 12,300 $ 114,100 <br />Segment 11 $ 275,700 $ 27,000 $ 248,700 <br />Extended Lighting $ 84,600 $ 84,600 <br />Edgewood Drive Crossing Removal $ 18,000 $ 18,000 <br />Subtotals $ 504,700 $ 39,300 $ 465,400 <br />Engineering (Design, Bidding, Construction Admin) $ 122,332 $ 122,332 <br />Totals $ 627,032 $ 39,300 $ 587,732
The URL can be used to link to this page
Your browser does not support the video tag.