Capital Improvement Projects <br />There was plenty of construction occurring in Mounds View during 2013. The following projects are a sampling <br />of the many municipal improvements that occur each year in Mounds View. In addition, Public Works staff <br />coordinates with other agencies with jurisdictional infrastructure in Mounds View such as Ramsey County Public <br />Works, Mn/DOT, Metropolitan Council Environmental Services, and neighboring cities. <br />Street and Utility Improvement Project —Area F <br />Another 3.0 miles of streets were reconstructed in Area F of the Street and Utility Improvement Program, <br />bringing the total to 18.4 miles complete and 7.5 miles to go. In March, the City awarded the Area F project to <br />Northwest Asphalt, Inc. of Shakopee, Minnesota for $3,122,034. Northwest Asphalt has been the successful <br />contractor for Areas B though F between 2010 and 2013. Stantec provided professional engineering services for <br />the project. <br />Construction costs continue to be much lower than expected and the bidding environment is excellent. Area F is <br />substantially complete and will be finalized in early 2014. The final estimated construction cost is currently <br />$2,898,395 —which is $223,639 below the contract amount. <br />Area A through E are complete and finaled out. The combined actual costs of these four areas is $14,067,663 <br />compared to combined budget amounts of $16,285,285 or $2,217,622 below budget. The Street and Utility <br />Improvement Program is currently tracking $3.5 million below budget. <br />Street and Utility Improvement Project—Area G <br />Stantec began engineering design and preparing construction plans and specifications for Area G construction <br />which is scheduled to occur in 2014. Braun Intertec is providing geotechnical testing and evaluation services. <br />Concrete work in Area F <br />/ <br />1J <br />� - <br />t <br />New playground at Silver View Park <br />Silver View Park Playground Replacement <br />A new playground was constructed at Silver View Park this summer and is ready for kids to use! The new <br />playground replaces the old playground but is located to the east side of the park shelter for better sight <br />exposure and safety. Three new playground units include a toddler set, age 5 to 12, and swing set. In addition, <br />the whirl and space climber units were salvage from the old playground, refurbished, and incorporated into the <br />new playground layout. The new playground equipment was designed and constructed by <br />Minnesota/Wisconsin Playground of Golden Valley, Minnesota. The total cost of the new playground <br />equipment and site work was approximately $110,000, with much of the grading and demolition performed in- <br />house by Public Works maintenance staff. <br />2013 ANNUAL REPORT I MOUNDS VIEW PUBLIC WORKS PAGE 9 <br />