My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2014/03/24
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2014
>
Agenda Packets - 2014/03/24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:47:03 PM
Creation date
6/19/2018 5:43:13 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
3/24/2014
Supplemental fields
City Council Document Type
City Council Packets
Date
3/24/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Capital Improvement Projects <br />There was plenty of construction occurring in Mounds View during 2013. The following projects are a sampling <br />of the many municipal improvements that occur each year in Mounds View. In addition, Public Works staff <br />coordinates with other agencies with jurisdictional infrastructure in Mounds View such as Ramsey County Public <br />Works, Mn/DOT, Metropolitan Council Environmental Services, and neighboring cities. <br />Street and Utility Improvement Project —Area F <br />Another 3.0 miles of streets were reconstructed in Area F of the Street and Utility Improvement Program, <br />bringing the total to 18.4 miles complete and 7.5 miles to go. In March, the City awarded the Area F project to <br />Northwest Asphalt, Inc. of Shakopee, Minnesota for $3,122,034. Northwest Asphalt has been the successful <br />contractor for Areas B though F between 2010 and 2013. Stantec provided professional engineering services for <br />the project. <br />Construction costs continue to be much lower than expected and the bidding environment is excellent. Area F is <br />substantially complete and will be finalized in early 2014. The final estimated construction cost is currently <br />$2,898,395 —which is $223,639 below the contract amount. <br />Area A through E are complete and finaled out. The combined actual costs of these four areas is $14,067,663 <br />compared to combined budget amounts of $16,285,285 or $2,217,622 below budget. The Street and Utility <br />Improvement Program is currently tracking $3.5 million below budget. <br />Street and Utility Improvement Project—Area G <br />Stantec began engineering design and preparing construction plans and specifications for Area G construction <br />which is scheduled to occur in 2014. Braun Intertec is providing geotechnical testing and evaluation services. <br />Concrete work in Area F <br />/ <br />1J <br />� - <br />t <br />New playground at Silver View Park <br />Silver View Park Playground Replacement <br />A new playground was constructed at Silver View Park this summer and is ready for kids to use! The new <br />playground replaces the old playground but is located to the east side of the park shelter for better sight <br />exposure and safety. Three new playground units include a toddler set, age 5 to 12, and swing set. In addition, <br />the whirl and space climber units were salvage from the old playground, refurbished, and incorporated into the <br />new playground layout. The new playground equipment was designed and constructed by <br />Minnesota/Wisconsin Playground of Golden Valley, Minnesota. The total cost of the new playground <br />equipment and site work was approximately $110,000, with much of the grading and demolition performed in- <br />house by Public Works maintenance staff. <br />2013 ANNUAL REPORT I MOUNDS VIEW PUBLIC WORKS PAGE 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.