My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2014/09/08
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2010-2019
>
2014
>
Agenda Packets - 2014/09/08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:55 PM
Creation date
6/20/2018 2:45:37 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
9/8/2014
Supplemental fields
City Council Document Type
City Council Packets
Date
9/8/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2015 Fee Schedule Page 18 of 20 <br /> <br />VI. PUBLIC WORKS RELATED FEES <br /> <br />CALL-OUT RATE SCHEDULE (used for all hourly-based fees in this chapter) <br />Normal Business Hours for Call-out Rates 7:00 a.m. to 3:30 p.m., Monday thru Friday <br />Standard Call-out Rate: Specified time <br />conducted entirely within normal business <br />hours <br />$50 per hour specified <br />After-Hours Call-out Rate: Specified time <br />conducted outside normal business hours <br />$100 per hour specified <br />Holiday Call-out Rate: Specified time <br />conducted on holidays <br />$150 per hour specified <br />RIGHT-OF-WAY MANAGEMENT FEES (Chapter 910) <br />Registration Fee (Annual) $30 <br />Excavation Permit Fees:* <br />Hole Fee <br />Trench Fees (requires Hole Fee) <br /> <br />Trenchless Fees (req. Hole Fee) <br /> $150 per hole excavated <br />$70 per 100 lineal feet of trenching beyond <br />hole <br />$35 per 100 lineal feet of utility installed <br />using trenchless methods (HDD, etc.) <br />Obstruction Permit Fees:* <br />Obstruction Base Fee <br />Lineal Obstruction Fee <br />(requires Obstruction Base Fee) <br /> <br />$70 per obstruction <br />$10 per 100 lineal feet obstructed (in-line w/ <br />traffic) per each week of obstruction <br />Permit Extension Fee $30 <br />Delay Penalty $15 per day <br />Restoration Cost Security: Determined on a <br />permit-by-permit basis by the PW Director <br />Hole Excavation (per hole) <br /> <br /> <br />Trench Excavation (per 100 feet) <br /> <br /> <br />Trenchless Excavation (per 100 feet) <br /> <br />Minimum security amounts: <br />Paved Areas: $5,000 <br />Turf Areas: $250 <br /> <br />Paved Areas: $5,000 <br />Turf Areas: $500 <br /> <br />Paved Areas: $500 <br />Turf Areas: $100 <br /> <br /> <br />*Additional fees may be required for legal and consulting engineering costs incurred by the <br />City
The URL can be used to link to this page
Your browser does not support the video tag.