Laserfiche WebLink
Resolution 8329 <br /> <br />OPTION B: <br />1. Groveland Road between County Road 10 and County Road J will be reconstructed as a <br />35.5-foot wide street, measured at the face of curb, with two 11-foot traffic lanes, one 8-foot <br />wide parallel parking on the west (southbound) side, and a 5.5-foot bike lane adjacent to the <br />east (northbound) side with a 6-foot concrete sidewalk immediately adjacent to the easterly <br />back of curb; and <br />2. Groveland Road will be signed with “No Parking” or equivalent traffic signs on the east side <br />(northbound traffic) between County Road 10 and County Road J. <br />OPTION C: <br />1. Groveland Road between County Road 10 and County Road J will be reconstructed as a 40- <br />foot wide street, measured at the face of curb, with two 11-foot traffic lanes and two 9-foot <br />wide parallel parking on the west (southbound) and east (northbound) sides. <br /> <br /> Adopted this 24th day of November, 2014. <br /> <br /> ____________________________________ <br /> Joe Flaherty, Mayor <br />ATTEST: <br /> ____________________________________ <br /> James Ericson, City Administrator <br />(SEAL)